IAC logo
IAC Assessment: NC0597
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0597
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Jet engine parts
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 300,000
Annual Production 3,000 Pieces
Production Hrs. Annual 7,200
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,265,510 16,896,000 kWh $0.07
Electricity Demand $264,078 30,600 kW-months/year $8.63
Natural Gas $67,699 7,797 MMBtu $8.68
TOTAL ENERGY COSTS $1,597,287
RECOMMENDED SAVINGS* $137,954 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,985
Cost:
$24,572
$16,419 219,207 $3,287 381 $2,279 - $16,419
219,207
kWh
$3,287
381
kW-months/year
$2,279
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$74,459
Cost:
$160,000
$64,146 856,423 $10,313 1,195 - - $64,146
856,423
kWh
$10,313
1,195
kW-months/year
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,175
Cost:
$3,200
$787 10,513 $388 45 - - $787
10,513
kWh
$388
45
kW-months/year
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$5,207
Cost:
$14,400
$4,368 58,320 $839 97 - - $4,368
58,320
kWh
$839
97
kW-months/year
-
-
$
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$35,128
Cost:
$100,000
$29,660 396,000 $5,468 634 - - $29,660
396,000
kWh
$5,468
634
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$137,954
Cost:
$302,172
$115,380 1,540,463 $20,295 2,352 $2,279 - $115,380
1,540,463
kWh
$20,295
2,352
kW-months/year
$2,279
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost