IAC Assessment: NC0598
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0598
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Hot sauces
NAICS 311941 - Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 70,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,867 2,453,919 kWh $0.06
Electricity Demand $27,348 6,477 kW-months/year $4.22
Natural Gas $43,900 6,175 MMBtu $7.11
TOTAL ENERGY COSTS $220,115
RECOMMENDED SAVINGS* $21,036 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,545
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,448
Cost:
$18,822
$3,104 51,131 $673 160 - - - - $671 - $3,104
51,131
kWh
$673
160
kW-months/year
-
-
MMBtu
-
-
$
$671
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$165
Cost:
$547
$165 2,720 - - - - - - - - $165
2,720
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,199
Cost:
$50
$993 16,357 $206 49 - - - - - - $993
16,357
kWh
$206
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,276
Cost:
$1,050
$2,276 37,500 - - - - - - - - $2,276
37,500
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$932
Cost:
$100
$1,169 19,265 $163 39 - - $(-200) - $(-200) - $1,169
19,265
kWh
$163
39
kW-months/year
-
-
MMBtu
$(-200)
-
$
$(-200)
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$432
Cost:
$500
- - - - $432 61 - - - - -
-
kWh
-
-
kW-months/year
$432
61
MMBtu
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,584
Cost:
$500
$11,584 - - - - - - - - - $11,584
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,036
Cost:
$21,569
$19,291 126,973 $1,042 248 $432 61 $(-200) - $471 - $19,291
126,973
kWh
$1,042
248
kW-months/year
$432
61
MMBtu
$(-200)
-
$
$471
-
$
TOTAL IMPLEMENTED Savings:
$5,545
Cost:
$19,469
$4,438 73,116 $836 199 - - $(-200) - $471 - $4,438
73,116
kWh
$836
199
kW-months/year
-
-
MMBtu
$(-200)
-
$
$471
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost