IAC logo
IAC Assessment: NC0600
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0600
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Spring mattresses
NAICS 337910 - Mattress Manufacturing
SIC 2515 - Mattresses And Bedsprings
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 150,000
Annual Production 450,000 Pieces
Production Hrs. Annual 2,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,761 1,824,618 kWh $0.06
Electricity Demand $19,995 4,473 kW-months/year $4.47
TOTAL ENERGY COSTS $132,756
RECOMMENDED SAVINGS* $12,727 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,929
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,705
Cost:
$10,366
$1,682 27,212 $612 137 - - $411 - $1,682
27,212
kWh
$612
137
kW-months/year
-
-
$
$411
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$191
Cost:
$850
$191 3,085 - - - - - - $191
3,085
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$383
Cost:
$200
$433 7,000 $150 34 $(-100) - $(-100) - $433
7,000
kWh
$150
34
kW-months/year
$(-100)
-
$
$(-100)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$650
Cost:
$1,200
$650 10,520 - - - - - - $650
10,520
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$8,798
Cost:
$500
$8,798 - - - - - - - $8,798
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$12,727
Cost:
$13,116
$11,754 47,817 $762 171 $(-100) - $311 - $11,754
47,817
kWh
$762
171
kW-months/year
$(-100)
-
$
$311
-
$
TOTAL IMPLEMENTED Savings:
$3,929
Cost:
$12,616
$2,956 47,817 $762 171 $(-100) - $311 - $2,956
47,817
kWh
$762
171
kW-months/year
$(-100)
-
$
$311
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost