IAC Assessment: NC0603
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0603
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Yarns
NAICS 313110 - Fiber, Yarn, and Thread Mills
SIC 2281 - Yarn Spinning Mills
Sales $1,000,000-$5,000,000
# of Employees 110
Plant Area (Sq.Ft.) 135,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $463,064 11,598,000 kWh $0.04
Electricity Demand $256,141 22,666 kW-months/year $11.30
TOTAL ENERGY COSTS $719,205
RECOMMENDED SAVINGS* $131,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,467
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,643
Cost:
$50,038
$8,818 220,990 $5,246 468 - - $3,579 - $8,818
220,990
kWh
$5,246
468
kW-months/year
-
-
$
$3,579
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$40
Cost:
$100
$40 998 - - - - - - $40
998
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,607
Cost:
$500
$4,002 100,296 $1,605 143 $(-500) - $(-500) - $4,002
100,296
kWh
$1,605
143
kW-months/year
$(-500)
-
$
$(-500)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$74
Cost:
$240
$74 1,864 - - - - - - $74
1,864
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,221
Cost:
$100
$2,300 57,624 $921 82 - - - - $2,300
57,624
kWh
$921
82
kW-months/year
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$21,836
Cost:
$50
$12,616 316,201 $9,220 823 - - - - $12,616
316,201
kWh
$9,220
823
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$64,413
Cost:
$100,000
$44,754 1,121,648 $19,659 1,755 - - - - $44,754
1,121,648
kWh
$19,659
1,755
kW-months/year
-
-
$
-
-
$
08: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$19,341
Cost:
$30,000
$19,341 484,733 - - - - - - $19,341
484,733
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$131,175
Cost:
$181,028
$91,945 2,304,354 $36,651 3,271 $(-500) - $3,079 - $91,945
2,304,354
kWh
$36,651
3,271
kW-months/year
$(-500)
-
$
$3,079
-
$
TOTAL IMPLEMENTED Savings:
$63,467
Cost:
$80,688
$44,817 1,123,218 $16,071 1,434 $(-500) - $3,079 - $44,817
1,123,218
kWh
$16,071
1,434
kW-months/year
$(-500)
-
$
$3,079
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost