IAC Assessment: NC0604
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0604
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Aircraft components
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 110,000
Annual Production 17,500 Pieces
Production Hrs. Annual 2,125
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,714 1,687,069 kWh $0.07
Electricity Demand $9,070 5,067 kW-months/year $1.79
Natural Gas $11,642 1,031 MMBtu $11.29
TOTAL ENERGY COSTS $138,426
RECOMMENDED SAVINGS* $2,874 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,606
Cost:
$3,300
$1,436 20,567 $21 12 - - - - $149 - $1,436
20,567
kWh
$21
12
kW-months/year
-
-
MMBtu
-
-
$
$149
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$452
Cost:
$1,000
- - - - $452 40 - - - - -
-
kWh
-
-
kW-months/year
$452
40
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$311
Cost:
$200
$491 7,028 $20 11 - - $(-100) - $(-100) - $491
7,028
kWh
$20
11
kW-months/year
-
-
MMBtu
$(-100)
-
$
$(-100)
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$505
Cost:
$2,577
$441 6,323 $64 36 - - - - - - $441
6,323
kWh
$64
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$2,874
Cost:
$7,077
$2,368 33,918 $105 59 $452 40 $(-100) - $49 - $2,368
33,918
kWh
$105
59
kW-months/year
$452
40
MMBtu
$(-100)
-
$
$49
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost