IAC logo
IAC Assessment: NC0605
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0605
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Photographic paper
NAICS 325992 - Photographic Film, Paper, Plate, and Chemical Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 350,000
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 4,750
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $533,779 13,664,000 kWh $0.04
Electricity Demand $388,859 34,640 kW-months/year $11.23
Natural Gas $371,400 74,799 MMBtu $4.97
TOTAL ENERGY COSTS $1,294,038
RECOMMENDED SAVINGS* $96,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,974
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$23,044
Cost:
$93,000
$4,434 113,400 $7,525 680 $11,085 2,314 - - $4,434
113,400
kWh
$7,525
680
kW-months/year
$11,085
2,314
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,828
Cost:
$10,328
$1,075 27,489 $1,477 134 - - $276 - $1,075
27,489
kWh
$1,477
134
kW-months/year
-
-
MMBtu
$276
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$118
Cost:
$50
$62 1,577 $44 4 - - $12 - $62
1,577
kWh
$44
4
kW-months/year
-
-
MMBtu
$12
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$812
Cost:
$1,000
$474 12,113 $338 31 - - - - $474
12,113
kWh
$338
31
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$685
Cost:
$2,000
$491 12,556 $194 18 - - - - $491
12,556
kWh
$194
18
kW-months/year
-
-
MMBtu
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$65,888
Cost:
$500
$65,888 - - - - - - - $65,888
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,455
Cost:
$11,302
$1,412 36,119 $2,043 185 - - - - $1,412
36,119
kWh
$2,043
185
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$96,830
Cost:
$118,180
$73,836 203,254 $11,621 1,052 $11,085 2,314 $288 - $73,836
203,254
kWh
$11,621
1,052
kW-months/year
$11,085
2,314
MMBtu
$288
-
$
TOTAL IMPLEMENTED Savings:
$72,974
Cost:
$24,180
$68,928 77,741 $3,758 341 - - $288 - $68,928
77,741
kWh
$3,758
341
kW-months/year
-
-
MMBtu
$288
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost