IAC logo
IAC Assessment: NC0608
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0608
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Yarns
NAICS 313110 - Fiber, Yarn, and Thread Mills
SIC 2284 - Thread Mills
Sales $10,000,000-$50,000,000
# of Employees 265
Plant Area (Sq.Ft.) 285,000
Annual Production 9,000,000 Pounds
Production Hrs. Annual 7,800
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,468,314 38,020,000 kWh $0.04
Electricity Demand $730,912 75,002 kW-months/year $9.75
Natural Gas $12,720 1,632 MMBtu $7.79
TOTAL ENERGY COSTS $2,211,946
RECOMMENDED SAVINGS* $204,282 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $204,282
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$49,355
Cost:
$165,749
$26,632 689,957 $11,829 1,223 - - $10,894 - $26,632
689,957
kWh
$11,829
1,223
kW-months/year
-
-
$
$10,894
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$566
Cost:
$894
$566 14,653 - - - - - - $566
14,653
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,681
Cost:
$200
$5,804 150,360 $2,077 215 $(-100) - $(-100) - $5,804
150,360
kWh
$2,077
215
kW-months/year
$(-100)
-
$
$(-100)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$241
Cost:
$675
$241 6,255 - - - - - - $241
6,255
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,353
Cost:
$15,000
$5,415 140,280 $1,938 200 - - - - $5,415
140,280
kWh
$1,938
200
kW-months/year
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,597
Cost:
$100
$6,330 164,000 $2,267 234 - - - - $6,330
164,000
kWh
$2,267
234
kW-months/year
-
-
$
-
-
$
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$100,563
Cost:
$75,000
$100,563 2,605,265 - - - - - - $100,563
2,605,265
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$29,926
Cost:
$2,000
$29,926 775,296 - - - - - - $29,926
775,296
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$204,282
Cost:
$259,618
$175,477 4,546,066 $18,111 1,872 $(-100) - $10,794 - $175,477
4,546,066
kWh
$18,111
1,872
kW-months/year
$(-100)
-
$
$10,794
-
$
TOTAL IMPLEMENTED Savings:
$204,282
Cost:
$259,618
$175,477 4,546,066 $18,111 1,872 $(-100) - $10,794 - $175,477
4,546,066
kWh
$18,111
1,872
kW-months/year
$(-100)
-
$
$10,794
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost