IAC Assessment: NC0609
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0609
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Steel shot
NAICS 327910 - Abrasive Product Manufacturing
SIC 3291 - Abrasive Products
Sales $50,000,000-$100,000,000
# of Employees 45
Plant Area (Sq.Ft.) 60,000
Annual Production 88,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,130,621 29,379,329 kWh $0.04
Electricity Demand $235,800 95,504 kW-months/year $2.47
Electricity Fees $21,701 - $ -
LPG $538,052 62,298 MMBtu $8.64
TOTAL ENERGY COSTS $1,926,174
RECOMMENDED SAVINGS* $14,867 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,289
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$9,405
Cost:
-
$6,791 176,400 $2,614 1,058 - - - - $6,791
176,400
kWh
$2,614
1,058
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,593
Cost:
$8,972
$1,036 26,906 $191 77 - - $366 - $1,036
26,906
kWh
$191
77
kW-months/year
-
-
$
$366
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$173
Cost:
$350
$173 4,489 - - - - - - $173
4,489
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$650
Cost:
$200
$753 19,560 $97 39 $(-100) - $(-100) - $753
19,560
kWh
$97
39
kW-months/year
$(-100)
-
$
$(-100)
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,341
Cost:
$2,500
$1,188 30,863 $153 61 - - - - $1,188
30,863
kWh
$153
61
kW-months/year
-
-
$
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,705
Cost:
$5,685
$1,511 39,257 $194 78 - - - - $1,511
39,257
kWh
$194
78
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$14,867
Cost:
$17,707
$11,452 297,475 $3,249 1,313 $(-100) - $266 - $11,452
297,475
kWh
$3,249
1,313
kW-months/year
$(-100)
-
$
$266
-
$
TOTAL IMPLEMENTED Savings:
$5,289
Cost:
$17,357
$4,488 116,586 $635 255 $(-100) - $266 - $4,488
116,586
kWh
$635
255
kW-months/year
$(-100)
-
$
$266
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost