Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2018 |
Principal Product | Steel shot |
NAICS | 327910 - Abrasive Product Manufacturing |
SIC | 3291 - Abrasive Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 88,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,130,621 | 29,379,329 | kWh | $0.04 |
Electricity Demand | $235,800 | 95,504 | kW-months/year | $2.47 |
Electricity Fees | $21,701 | - | $ | - |
LPG | $538,052 | 62,298 | MMBtu | $8.64 |
TOTAL ENERGY COSTS | $1,926,174 | |||
RECOMMENDED SAVINGS* | $14,867 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,289 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS |
Savings: $9,405 Cost: - |
$6,791 | 176,400 | $2,614 | 1,058 | - | - | - | - |
$6,791 176,400 kWh |
$2,614 1,058 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,593 Cost: $8,972 |
$1,036 | 26,906 | $191 | 77 | - | - | $366 | - |
$1,036 26,906 kWh |
$191 77 kW-months/year |
- - $ |
$366 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $173 Cost: $350 |
$173 | 4,489 | - | - | - | - | - | - |
$173 4,489 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $650 Cost: $200 |
$753 | 19,560 | $97 | 39 | $(-100) | - | $(-100) | - |
$753 19,560 kWh |
$97 39 kW-months/year |
$(-100) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,341 Cost: $2,500 |
$1,188 | 30,863 | $153 | 61 | - | - | - | - |
$1,188 30,863 kWh |
$153 61 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,705 Cost: $5,685 |
$1,511 | 39,257 | $194 | 78 | - | - | - | - |
$1,511 39,257 kWh |
$194 78 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,867 Cost: $17,707 |
$11,452 | 297,475 | $3,249 | 1,313 | $(-100) | - | $266 | - | $11,452 297,475 kWh |
$3,249 1,313 kW-months/year |
$(-100) - $ |
$266 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,289 Cost: $17,357 |
$4,488 | 116,586 | $635 | 255 | $(-100) | - | $266 | - | $4,488 116,586 kWh |
$635 255 kW-months/year |
$(-100) - $ |
$266 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost |