IAC logo
IAC Assessment: NC0610
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0610
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Wood Veneer
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 241,500
Annual Production 16,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,522 3,045,200 kWh $0.05
Electricity Demand $77,894 8,943 kW-months/year $8.71
Wood $1 20,000 MMBtu $0.00
TOTAL ENERGY COSTS $223,417
RECOMMENDED SAVINGS* $44,179 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,192
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,309
Cost:
$135,942
$14,300 299,166 $8,770 1,008 - - $2,239 - $14,300
299,166
kWh
$8,770
1,008
kW-months/year
-
-
$
$2,239
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,172
Cost:
$200
$1,364 28,539 $608 70 $(-400) - $(-400) - $1,364
28,539
kWh
$608
70
kW-months/year
$(-400)
-
$
$(-400)
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,006
Cost:
$1,350
$1,006 21,052 - - - - - - $1,006
21,052
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$981
Cost:
$100
$671 14,046 $310 36 - - - - $671
14,046
kWh
$310
36
kW-months/year
-
-
$
-
-
$
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$4,293
Cost:
$10,000
$3,436 71,885 $857 99 - - - - $3,436
71,885
kWh
$857
99
kW-months/year
-
-
$
-
-
$
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$9,484
Cost:
$10,000
$7,592 158,819 $1,892 218 - - - - $7,592
158,819
kWh
$1,892
218
kW-months/year
-
-
$
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,934
Cost:
$5,865
$1,251 26,171 $683 78 - - - - $1,251
26,171
kWh
$683
78
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$44,179
Cost:
$163,457
$29,620 619,678 $13,120 1,509 $(-400) - $1,839 - $29,620
619,678
kWh
$13,120
1,509
kW-months/year
$(-400)
-
$
$1,839
-
$
TOTAL IMPLEMENTED Savings:
$42,192
Cost:
$162,007
$27,943 584,580 $12,810 1,473 $(-400) - $1,839 - $27,943
584,580
kWh
$12,810
1,473
kW-months/year
$(-400)
-
$
$1,839
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost