IAC Assessment: NC0613
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0613
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Fabrics
NAICS 313210 - Broadwoven Fabric Mills
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $10,000,000-$50,000,000
# of Employees 86
Plant Area (Sq.Ft.) 140,000
Annual Production 4,800,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $305,743 5,649,520 kWh $0.05
Electricity Demand $56,825 12,710 kW-months/year $4.47
Electricity Fees $381 - $ -
Natural Gas $48,133 7,672 MMBtu $6.27
TOTAL ENERGY COSTS $411,082
RECOMMENDED SAVINGS* $84,308 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,675
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,956
Cost:
$81,978
$23,756 438,302 $4,200 940 - - - - - - $23,756
438,302
kWh
$4,200
940
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$698
Cost:
$5,976
$698 12,872 - - - - - - - - $698
12,872
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,628
Cost:
$200
$13,587 250,680 $2,241 501 - - $(-400) - $(-800) - $13,587
250,680
kWh
$2,241
501
kW-months/year
-
-
Tgal
$(-400)
-
$
$(-800)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,751
Cost:
$2,700
$1,751 32,298 - - - - - - - - $1,751
32,298
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$6,422
Cost:
$1,500
- - - - $6,422 380 - - - - -
-
kWh
-
-
kW-months/year
$6,422
380
Tgal
-
-
$
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,218
Cost:
$500
$89,075 - $(-86,857) - - - - - - - $89,075
-
kWh
$(-86,857)
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$27,242
Cost:
$500
$27,242 - - - - - - - - - $27,242
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$914
Cost:
$1,700
$785 14,484 $129 29 - - - - - - $785
14,484
kWh
$129
29
kW-months/year
-
-
Tgal
-
-
$
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,479
Cost:
$5,865
$2,128 39,257 $351 78 - - - - - - $2,128
39,257
kWh
$351
78
kW-months/year
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$84,308
Cost:
$100,919
$159,022 787,893 $(-79,936) 1,548 $6,422 380 $(-400) - $(-800) - $159,022
787,893
kWh
$(-79,936)
1,548
kW-months/year
$6,422
380
Tgal
$(-400)
-
$
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
$46,675
Cost:
$95,719
$40,954 755,595 $6,921 1,548 - - $(-400) - $(-800) - $40,954
755,595
kWh
$6,921
1,548
kW-months/year
-
-
Tgal
$(-400)
-
$
$(-800)
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Usage Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Personnel Changes Ancillary Material Cost