Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2018 |
Principal Product | Adhesives |
NAICS | 325520 - Adhesive Manufacturing |
SIC | 2891 - Adhesives And Sealants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 26 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 8,000,000 Pounds |
Production Hrs. Annual | 3,125 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $63,946 | 926,520 | kWh | $0.07 |
Electricity Demand | $10,051 | 1,491 | kW-months/year | $6.74 |
Electricity Fees | $8,711 | - | $ | - |
Natural Gas | $38,308 | 6,658 | MMBtu | $5.75 |
TOTAL ENERGY COSTS | $121,016 | |||
RECOMMENDED SAVINGS* | $11,939 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,639 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,647 Cost: $16,472 |
$2,874 | 41,655 | $1,773 | 263 | - | - |
$2,874 41,655 kWh |
$1,773 263 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,341 Cost: $450 |
$1,058 | 15,330 | $283 | 42 | - | - |
$1,058 15,330 kWh |
$283 42 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $352 Cost: $90 |
- | - | - | - | $352 | 61 |
- - kWh |
- - kW-months/year |
$352 61 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $4,137 Cost: $12,000 |
$3,009 | 43,602 | $1,128 | 168 | - | - |
$3,009 43,602 kWh |
$1,128 168 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $300 Cost: $1,250 |
- | - | - | - | $300 | 52 |
- - kWh |
- - kW-months/year |
$300 52 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,162 Cost: $50,000 |
- | - | - | - | $1,162 | 202 |
- - kWh |
- - kW-months/year |
$1,162 202 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,939 Cost: $80,262 |
$6,941 | 100,587 | $3,184 | 473 | $1,814 | 315 | $6,941 100,587 kWh |
$3,184 473 kW-months/year |
$1,814 315 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,639 Cost: $79,012 |
$6,941 | 100,587 | $3,184 | 473 | $1,514 | 263 | $6,941 100,587 kWh |
$3,184 473 kW-months/year |
$1,514 263 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |