IAC Assessment: NC0623
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2018
Principal Product Fabrics
NAICS 336360 - Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2396 - Automotive And Apparel Trimmings
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 300,000
Annual Production 11,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $627,886 11,941,445 kWh $0.05
Electricity Demand $223,086 22,601 kW-months/year $9.87
Natural Gas $717,426 158,263 MMBtu $4.53
TOTAL ENERGY COSTS $1,568,398
RECOMMENDED SAVINGS* $66,371 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,921
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,801
Cost:
$500
$2,529 45,160 $776 90 - - - - $(-480) - $(-24) - $2,529
45,160
kWh
$776
90
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-480)
-
$
$(-24)
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,322
Cost:
$900
$1,322 23,615 - - - - - - - - - - $1,322
23,615
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,320
Cost:
$1,203
- - - - $2,320 512 - - - - - - -
-
kWh
-
-
kW-months/year
$2,320
512
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$6,478
Cost:
$16,800
$(-580) (-10,350) $(-422) (-49) - - $32,480 16,000 $(-25,000) - - - $(-580)
(-10,350)
kWh
$(-422)
(-49)
kW-months/year
-
-
MMBtu
$32,480
16,000
Tgal
$(-25,000)
-
$
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$14,884
Cost:
$10,000
$14,884 265,790 - - - - - - - - - - $14,884
265,790
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.4154 AVOID REWINDING MOTORS MORE THAN TWICE Savings:
$38,566
Cost:
$70,014
$29,512 526,997 $9,054 1,054 - - - - - - - - $29,512
526,997
kWh
$9,054
1,054
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$66,371
Cost:
$99,417
$47,667 851,212 $9,408 1,095 $2,320 512 $32,480 16,000 $(-25,480) - $(-24) - $47,667
851,212
kWh
$9,408
1,095
kW-months/year
$2,320
512
MMBtu
$32,480
16,000
Tgal
$(-25,480)
-
$
$(-24)
-
$
TOTAL IMPLEMENTED Savings:
$12,921
Cost:
$19,403
$3,271 58,425 $354 41 $2,320 512 $32,480 16,000 $(-25,480) - $(-24) - $3,271
58,425
kWh
$354
41
kW-months/year
$2,320
512
MMBtu
$32,480
16,000
Tgal
$(-25,480)
-
$
$(-24)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Ancillary Material Cost