IAC logo
IAC Assessment: NC0624
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0624
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Oriented Strand Board
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $100,000,000-$500,000,000
# of Employees 151
Plant Area (Sq.Ft.) 300,000
Annual Production 520,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,882,112 61,368,737 kWh $0.05
Electricity Demand $1,556,106 97,260 kW-months/year $16.00
Natural Gas $927,500 232,000 MMBtu $4.00
Wood $1 2,200,000 MMBtu $0.00
TOTAL ENERGY COSTS $5,365,719
RECOMMENDED SAVINGS* $92,391 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,704
Cost:
$24,212
$25,746 546,624 $11,958 749 - - - - - - $25,746
546,624
kWh
$11,958
749
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,403
Cost:
$200
$7,623 161,842 $3,540 222 - - $(-2,880) - $(-2,880) - $7,623
161,842
kWh
$3,540
222
kW-months/year
-
-
MMBtu
$(-2,880)
-
$
$(-2,880)
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$107
Cost:
$450
$107 2,282 - - - - - - - - $107
2,282
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4154 AVOID REWINDING MOTORS MORE THAN TWICE Savings:
$39,622
Cost:
$58,313
$27,055 574,424 $12,567 787 - - - - - - $27,055
574,424
kWh
$12,567
787
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$9,555
Cost:
$2,000
- - - - $9,555 2,904 - - - - -
-
kWh
-
-
kW-months/year
$9,555
2,904
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$92,391
Cost:
$85,175
$60,531 1,285,172 $28,065 1,758 $9,555 2,904 $(-2,880) - $(-2,880) - $60,531
1,285,172
kWh
$28,065
1,758
kW-months/year
$9,555
2,904
MMBtu
$(-2,880)
-
$
$(-2,880)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost