Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2019 |
Principal Product | Oriented Strand Board |
NAICS | 321219 - Reconstituted Wood Product Manufacturing |
SIC | 2493 - Reconstituted Wood Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 151 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 520,000 Thousand Feet |
Production Hrs. Annual | 8,736 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,882,112 | 61,368,737 | kWh | $0.05 |
Electricity Demand | $1,556,106 | 97,260 | kW-months/year | $16.00 |
Natural Gas | $927,500 | 232,000 | MMBtu | $4.00 |
Wood | $1 | 2,200,000 | MMBtu | $0.00 |
TOTAL ENERGY COSTS | $5,365,719 | |||
RECOMMENDED SAVINGS* | $92,391 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $37,704 Cost: $24,212 |
$25,746 | 546,624 | $11,958 | 749 | - | - | - | - | - | - |
$25,746 546,624 kWh |
$11,958 749 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,403 Cost: $200 |
$7,623 | 161,842 | $3,540 | 222 | - | - | $(-2,880) | - | $(-2,880) | - |
$7,623 161,842 kWh |
$3,540 222 kW-months/year |
- - MMBtu |
$(-2,880) - $ |
$(-2,880) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $107 Cost: $450 |
$107 | 2,282 | - | - | - | - | - | - | - | - |
$107 2,282 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4154 AVOID REWINDING MOTORS MORE THAN TWICE |
Savings: $39,622 Cost: $58,313 |
$27,055 | 574,424 | $12,567 | 787 | - | - | - | - | - | - |
$27,055 574,424 kWh |
$12,567 787 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY |
Savings: $9,555 Cost: $2,000 |
- | - | - | - | $9,555 | 2,904 | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,555 2,904 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $92,391 Cost: $85,175 |
$60,531 | 1,285,172 | $28,065 | 1,758 | $9,555 | 2,904 | $(-2,880) | - | $(-2,880) | - | $60,531 1,285,172 kWh |
$28,065 1,758 kW-months/year |
$9,555 2,904 MMBtu |
$(-2,880) - $ |
$(-2,880) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |