Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2019 |
Principal Product | Adhesive tapes |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 179 |
Plant Area (Sq.Ft.) | 166,200 |
Annual Production | 1,026,000 Units |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $221,493 | 5,854,928 | kWh | $0.04 |
Electricity Demand | $97,274 | 8,649 | kW-months/year | $11.25 |
Natural Gas | $176,242 | 32,844 | MMBtu | $5.37 |
TOTAL ENERGY COSTS | $495,009 | |||
RECOMMENDED SAVINGS* | $56,256 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $55,331 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,799 Cost: $71,461 |
$13,822 | 365,656 | $6,977 | 620 | - | - | - | - | - | - |
$13,822 365,656 kWh |
$6,977 620 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,085 Cost: $345 |
$2,407 | 63,672 | $1,023 | 91 | - | - | $(-300) | - | $(-45) | - |
$2,407 63,672 kWh |
$1,023 91 kW-months/year |
- - MMBtu |
$(-300) - $ |
$(-45) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $925 Cost: $100 |
$649 | 17,177 | $276 | 24 | - | - | - | - | - | - |
$649 17,177 kWh |
$276 24 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $28,232 Cost: $500 |
$28,232 | - | - | - | - | - | - | - | - | - |
$28,232 - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,215 Cost: - |
- | - | - | - | $4,215 | 785 | - | - | $(-1,000) | - |
- - kWh |
- - kW-months/year |
$4,215 785 MMBtu |
- - $ |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,256 Cost: $72,406 |
$45,110 | 446,505 | $8,276 | 735 | $4,215 | 785 | $(-300) | - | $(-1,045) | - | $45,110 446,505 kWh |
$8,276 735 kW-months/year |
$4,215 785 MMBtu |
$(-300) - $ |
$(-1,045) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $55,331 Cost: $72,306 |
$44,461 | 429,328 | $8,000 | 711 | $4,215 | 785 | $(-300) | - | $(-1,045) | - | $44,461 429,328 kWh |
$8,000 711 kW-months/year |
$4,215 785 MMBtu |
$(-300) - $ |
$(-1,045) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |