IAC Assessment: NC0636
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0636
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Wood boxes
NAICS 321920 - Wood Container and Pallet Manufacturing
SIC 2441 - Nailed Wood Boxes And Shook
Sales $50,000,000-$100,000,000
# of Employees 105
Plant Area (Sq.Ft.) 152,000
Annual Production 25,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,855 1,717,095 kWh $0.06
Electricity Demand $63,850 7,599 kW-months/year $8.40
Wood $1 57,375 MMBtu $0.00
TOTAL ENERGY COSTS $164,706
RECOMMENDED SAVINGS* $37,367 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,113
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,929
Cost:
$16,627
$6,246 106,410 $2,683 319 - - $6,246
106,410
kWh
$2,683
319
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$362
Cost:
$871
$362 6,171 - - - - $362
6,171
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$184
Cost:
$60
$129 2,190 $55 7 - - $129
2,190
kWh
$55
7
kW-months/year
-
-
$
04: 2.3411 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT Savings:
$27,892
Cost:
$85,000
$23,010 392,000 $9,882 1,176 $(-5,000) - $23,010
392,000
kWh
$9,882
1,176
kW-months/year
$(-5,000)
-
$
TOTAL RECOMMENDED Savings:
$37,367
Cost:
$102,558
$29,747 506,771 $12,620 1,502 $(-5,000) - $29,747
506,771
kWh
$12,620
1,502
kW-months/year
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$9,113
Cost:
$16,687
$6,375 108,600 $2,738 326 - - $6,375
108,600
kWh
$2,738
326
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost