IAC logo
IAC Assessment: NC0641
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0641
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2019
Principal Product Plastic mesh bags
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 44,000
Annual Production 9,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $429,510 5,915,800 kWh $0.07
Electricity Demand $54,918 12,922 kW-months/year $4.25
Electricity Fees $297 - $ -
Natural Gas $20,706 2,859 MMBtu $7.24
TOTAL ENERGY COSTS $505,431
RECOMMENDED SAVINGS* $53,044 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,143
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,164
Cost:
$120
$1,042 14,350 $122 29 - - $1,042
14,350
kWh
$122
29
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$18,554
Cost:
$21,000
$26,572 366,000 $3,111 732 $(-11,129) (-1,666) $26,572
366,000
kWh
$3,111
732
kW-months/year
$(-11,129)
(-1,666)
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$29,143
Cost:
$35,000
$26,101 359,520 $3,042 719 - - $26,101
359,520
kWh
$3,042
719
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,183
Cost:
$16,246
$3,648 50,245 $535 126 - - $3,648
50,245
kWh
$535
126
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$53,044
Cost:
$72,366
$57,363 790,115 $6,810 1,606 $(-11,129) (-1,666) $57,363
790,115
kWh
$6,810
1,606
kW-months/year
$(-11,129)
(-1,666)
MMBtu
TOTAL IMPLEMENTED Savings:
$29,143
Cost:
$35,000
$26,101 359,520 $3,042 719 - - $26,101
359,520
kWh
$3,042
719
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas