IAC logo
IAC Assessment: NC0646
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0646
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2020
Principal Product Wood chips and fuel for paper mills
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 8
Plant Area (Sq.Ft.) 3,300
Annual Production 260,000,000 Pounds
Production Hrs. Annual 2,625
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,943 420,480 kWh $0.08
Electricity Demand $13,509 3,453 kW-months/year $3.91
Electricity Fees $1,584 - $ -
Fuel Oil #2 $55,485 3,515 MMBtu $15.79
TOTAL ENERGY COSTS $109,387
RECOMMENDED SAVINGS* $385,648 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $377,934
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Water Disposal Increase in Production Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Water Disposal Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ %
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$377,240
Cost:
$300,000
$(-18,620) (-238,720) $(-5,583) (-1,428) - - $34,953 2,215 - - $366,490 - $(-18,620)
(-238,720)
kWh
$(-5,583)
(-1,428)
kW-months/year
-
-
$
$34,953
2,215
MMBtu
-
-
Tgal
$366,490
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$225
Cost:
$778
$182 2,339 $43 11 - - - - - - - - $182
2,339
kWh
$43
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
%
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$188
Cost:
$83
$188 2,408 - - - - - - - - - - $188
2,408
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
%
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$694
Cost:
$362
$1,638 21,000 $469 120 - - $(-1,413) (-90) - - - - $1,638
21,000
kWh
$469
120
kW-months/year
-
-
$
$(-1,413)
(-90)
MMBtu
-
-
Tgal
-
-
%
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,484
Cost:
$7,500
- - - - $2,484 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,484
-
$
-
-
MMBtu
-
-
Tgal
-
-
%
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$4,817
Cost:
$6,709
- - - - - - - - $4,817 378 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$4,817
378
Tgal
-
-
%
TOTAL RECOMMENDED Savings:
$385,648
Cost:
$315,432
$(-16,612) (-212,973) $(-5,071) (-1,297) $2,484 - $33,540 2,125 $4,817 378 $366,490 - $(-16,612)
(-212,973)
kWh
$(-5,071)
(-1,297)
kW-months/year
$2,484
-
$
$33,540
2,125
MMBtu
$4,817
378
Tgal
$366,490
-
%
TOTAL IMPLEMENTED Savings:
$377,934
Cost:
$300,362
$(-16,982) (-217,720) $(-5,114) (-1,308) - - $33,540 2,125 - - $366,490 - $(-16,982)
(-217,720)
kWh
$(-5,114)
(-1,308)
kW-months/year
-
-
$
$33,540
2,125
MMBtu
-
-
Tgal
$366,490
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ %
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Water Disposal Increase in Production Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Water Disposal Increase in Production