IAC Assessment: NC0661
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0661
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2021
Principal Product Friction disks
NAICS 336340 - Motor Vehicle Brake System Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 137
Plant Area (Sq.Ft.) 240,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $745,403 15,718,380 kWh $0.05
Electricity Demand $601,487 45,666 kW-months/year $13.17
Electricity Fees $(-84,704) - $ -
Natural Gas $36,225 4,931 MMBtu $7.35
TOTAL ENERGY COSTS $1,302,158
RECOMMENDED SAVINGS* $11,589 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,982
Cost:
$3,360
$1,274 26,880 $708 54 - - - - $1,274
26,880
kWh
$708
54
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,073
Cost:
$27,600
- - - - $6,073 826 - - -
-
kWh
-
-
kW-months/year
$6,073
826
MMBtu
-
-
Tgal
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,376
Cost:
$4,000
$997 21,024 $379 29 - - - - $997
21,024
kWh
$379
29
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,158
Cost:
$2,300
- - - - - - $2,158 863 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,158
863
Tgal
TOTAL RECOMMENDED Savings:
$11,589
Cost:
$37,260
$2,271 47,904 $1,087 83 $6,073 826 $2,158 863 $2,271
47,904
kWh
$1,087
83
kW-months/year
$6,073
826
MMBtu
$2,158
863
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal