Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2021 |
Principal Product | Power line components |
NAICS | 335932 - Noncurrent-Carrying Wiring Device Manufacturing |
SIC | 3644 - Noncurrent-carrying Wiring Devices |
Sales | $50,000,000-$100,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 288,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 8,600 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $550,201 | 8,778,154 | kWh | $0.06 |
Electricity Demand | $148,628 | 20,841 | kW-months/year | $7.13 |
Electricity Fees | $598 | - | $ | - |
Natural Gas | $36,827 | 4,180 | MMBtu | $8.81 |
TOTAL ENERGY COSTS | $736,254 | |||
RECOMMENDED SAVINGS* | $121,695 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,757 Cost: $2,000 |
$3,875 | 61,800 | $882 | 124 | - | - | - | - |
$3,875 61,800 kWh |
$882 124 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,792 Cost: $5,472 |
- | - | - | - | $4,792 | 544 | - | - |
- - kWh |
- - kW-months/year |
$4,792 544 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $10,634 Cost: $39,970 |
$16,929 | 270,000 | $3,850 | 540 | $(-10,145) | (-1,152) | - | - |
$16,929 270,000 kWh |
$3,850 540 kW-months/year |
$(-10,145) (-1,152) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,566 Cost: $3,150 |
$3,566 | 56,875 | - | - | - | - | - | - |
$3,566 56,875 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $64 Cost: $280 |
$64 | 1,020 | - | - | - | - | - | - |
$64 1,020 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $19,234 Cost: $75,000 |
$30,437 | 485,440 | $9,412 | 1,320 | $(-20,615) | (-2,340) | - | - |
$30,437 485,440 kWh |
$9,412 1,320 kW-months/year |
$(-20,615) (-2,340) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $78,648 Cost: $250,000 |
$27,517 | 438,860 | $3,131 | 439 | - | - | $48,000 | - |
$27,517 438,860 kWh |
$3,131 439 kW-months/year |
- - MMBtu |
$48,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $121,695 Cost: $375,872 |
$82,388 | 1,313,995 | $17,275 | 2,423 | $(-25,968) | (-2,948) | $48,000 | - | $82,388 1,313,995 kWh |
$17,275 2,423 kW-months/year |
$(-25,968) (-2,948) MMBtu |
$48,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |