IAC logo
IAC Assessment: NC0662
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0662
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2021
Principal Product Power line components
NAICS 335932 - Noncurrent-Carrying Wiring Device Manufacturing
SIC 3644 - Noncurrent-carrying Wiring Devices
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 288,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 8,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $550,201 8,778,154 kWh $0.06
Electricity Demand $148,628 20,841 kW-months/year $7.13
Electricity Fees $598 - $ -
Natural Gas $36,827 4,180 MMBtu $8.81
TOTAL ENERGY COSTS $736,254
RECOMMENDED SAVINGS* $121,695 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,757
Cost:
$2,000
$3,875 61,800 $882 124 - - - - $3,875
61,800
kWh
$882
124
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,792
Cost:
$5,472
- - - - $4,792 544 - - -
-
kWh
-
-
kW-months/year
$4,792
544
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,634
Cost:
$39,970
$16,929 270,000 $3,850 540 $(-10,145) (-1,152) - - $16,929
270,000
kWh
$3,850
540
kW-months/year
$(-10,145)
(-1,152)
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,566
Cost:
$3,150
$3,566 56,875 - - - - - - $3,566
56,875
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$64
Cost:
$280
$64 1,020 - - - - - - $64
1,020
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$19,234
Cost:
$75,000
$30,437 485,440 $9,412 1,320 $(-20,615) (-2,340) - - $30,437
485,440
kWh
$9,412
1,320
kW-months/year
$(-20,615)
(-2,340)
MMBtu
-
-
$
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$78,648
Cost:
$250,000
$27,517 438,860 $3,131 439 - - $48,000 - $27,517
438,860
kWh
$3,131
439
kW-months/year
-
-
MMBtu
$48,000
-
$
TOTAL RECOMMENDED Savings:
$121,695
Cost:
$375,872
$82,388 1,313,995 $17,275 2,423 $(-25,968) (-2,948) $48,000 - $82,388
1,313,995
kWh
$17,275
2,423
kW-months/year
$(-25,968)
(-2,948)
MMBtu
$48,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes