IAC logo
IAC Assessment: ND0011
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0011
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1991
Principal Product SNACK FOOD
NAICS n/a
SIC 2096 - Potato Chips And Similar Snacks
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 0
Annual Production 100,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $964,603 25,216,003 kWh $0.04
Natural Gas $499,878 345,073 MMBtu $1.45
Coal $353,233 191,163 MMBtu $1.85
TOTAL ENERGY COSTS $1,817,714
RECOMMENDED SAVINGS* $89,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,047
#|Description Savings
Cost
Status Electricity Usage Natural Gas Coal Administrative Changes Electricity Usage Natural Gas Coal Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$41,503
Cost:
$2,000
- - $14,783 14,080 $26,720 14,443 - - -
-
kWh
$14,783
14,080
MMBtu
$26,720
14,443
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,123
Cost:
$9,103
$5,123 136,284 - - - - - - $5,123
136,284
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$14,515
Cost:
-
- - - - - - $14,515 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$14,515
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,735
Cost:
$35,163
$11,735 - - - - - - - $11,735
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$9,694
Cost:
-
- - - - - - $9,694 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$9,694
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,996
Cost:
-
$6,010 162,075 - - - - $(-3,014) - $6,010
162,075
kWh
-
-
MMBtu
-
-
MMBtu
$(-3,014)
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,544
Cost:
$700
- - $3,544 3,375 - - - - -
-
kWh
$3,544
3,375
MMBtu
-
-
MMBtu
-
-
$
08: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$146
Cost:
$250
- - $146 139 - - - - -
-
kWh
$146
139
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$89,256
Cost:
$47,216
$22,868 298,359 $18,473 17,594 $26,720 14,443 $21,195 - $22,868
298,359
kWh
$18,473
17,594
MMBtu
$26,720
14,443
MMBtu
$21,195
-
$
TOTAL IMPLEMENTED Savings:
$65,047
Cost:
$47,216
$22,868 298,359 $18,473 17,594 $26,720 14,443 $(-3,014) - $22,868
298,359
kWh
$18,473
17,594
MMBtu
$26,720
14,443
MMBtu
$(-3,014)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Coal Administrative Changes Electricity Usage Natural Gas Coal Administrative Changes