IAC Assessment: ND0029
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0029
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1992
Principal Product PLASTIC PLATINGS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,447 3,740,035 kWh $0.05
Natural Gas $7,868 3,074 MMBtu $2.56
TOTAL ENERGY COSTS $208,315
RECOMMENDED SAVINGS* $3,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,656
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,484
Cost:
$6,140
$2,484 46,014 - - $2,484
46,014
kWh
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,172
Cost:
$400
$1,172 21,981 - - $1,172
21,981
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$124
Cost:
$528
$198 3,810 $(-74) - $198
3,810
kWh
$(-74)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$50
Cost:
$100
$50 879 - - $50
879
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$3,830
Cost:
$7,168
$3,904 72,684 $(-74) - $3,904
72,684
kWh
$(-74)
-
$
TOTAL IMPLEMENTED Savings:
$3,656
Cost:
$6,540
$3,656 67,995 - - $3,656
67,995
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes