Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1993 |
Principal Product | Bulk Pharmaceuticals |
NAICS | n/a |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $10,000,000-$50,000,000 |
# of Employees | 97 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 189,000 Pounds |
Production Hrs. Annual | 7,344 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $203,780 | 3,742,673 | kWh | $0.05 |
Natural Gas | $111,370 | 32,760 | MMBtu | $3.40 |
TOTAL ENERGY COSTS | $315,150 | |||
RECOMMENDED SAVINGS* | $75,215 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,501 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Raw Material | Electricity Usage | Natural Gas | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $49,625 Cost: $65,000 |
- | - | - | - | $49,625 | - |
- - kWh |
- - MMBtu |
$49,625 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $17,985 Cost: $18,200 |
$2,100 | 39,273 | $15,885 | 4,742 | - | - |
$2,100 39,273 kWh |
$15,885 4,742 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,640 Cost: $21,590 |
$2,640 | 49,824 | - | - | - | - |
$2,640 49,824 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,876 Cost: $3,837 |
$2,876 | 50,996 | - | - | - | - |
$2,876 50,996 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $939 Cost: $160 |
$939 | 17,585 | - | - | - | - |
$939 17,585 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $790 Cost: $430 |
$790 | 4,982 | - | - | - | - |
$790 4,982 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $235 Cost: $200 |
$235 | 4,396 | - | - | - | - |
$235 4,396 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $125 Cost: $200 |
$125 | 2,345 | - | - | - | - |
$125 2,345 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,215 Cost: $109,617 |
$9,705 | 169,401 | $15,885 | 4,742 | $49,625 | - | $9,705 169,401 kWh |
$15,885 4,742 MMBtu |
$49,625 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,501 Cost: $43,627 |
$7,616 | 140,093 | $15,885 | 4,742 | - | - | $7,616 140,093 kWh |
$15,885 4,742 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Raw Material | Electricity Usage | Natural Gas | Primary Raw Material |