IAC logo
IAC Assessment: ND0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1993
Principal Product Bulk Pharmaceuticals
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 97
Plant Area (Sq.Ft.) 40,000
Annual Production 189,000 Pounds
Production Hrs. Annual 7,344
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $203,780 3,742,673 kWh $0.05
Natural Gas $111,370 32,760 MMBtu $3.40
TOTAL ENERGY COSTS $315,150
RECOMMENDED SAVINGS* $75,215 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,501
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Raw Material Electricity Usage Natural Gas Primary Raw Material
$ kWh $ MMBtu $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$49,625
Cost:
$65,000
- - - - $49,625 - -
-
kWh
-
-
MMBtu
$49,625
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$17,985
Cost:
$18,200
$2,100 39,273 $15,885 4,742 - - $2,100
39,273
kWh
$15,885
4,742
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,640
Cost:
$21,590
$2,640 49,824 - - - - $2,640
49,824
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,876
Cost:
$3,837
$2,876 50,996 - - - - $2,876
50,996
kWh
-
-
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$939
Cost:
$160
$939 17,585 - - - - $939
17,585
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$790
Cost:
$430
$790 4,982 - - - - $790
4,982
kWh
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$235
Cost:
$200
$235 4,396 - - - - $235
4,396
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$125
Cost:
$200
$125 2,345 - - - - $125
2,345
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$75,215
Cost:
$109,617
$9,705 169,401 $15,885 4,742 $49,625 - $9,705
169,401
kWh
$15,885
4,742
MMBtu
$49,625
-
$
TOTAL IMPLEMENTED Savings:
$23,501
Cost:
$43,627
$7,616 140,093 $15,885 4,742 - - $7,616
140,093
kWh
$15,885
4,742
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Raw Material Electricity Usage Natural Gas Primary Raw Material