IAC logo
IAC Assessment: ND0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1993
Principal Product steel automotive parts
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 300,000
Annual Production 1,700,000 Pieces
Production Hrs. Annual 4,160
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $942,561 19,917,351 kWh $0.05
Natural Gas $213,584 76,144 MMBtu $2.81
TOTAL ENERGY COSTS $1,156,145
RECOMMENDED SAVINGS* $58,932 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,124
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,964
Cost:
$4,533
$5,964 126,026 - - $5,964
126,026
kWh
-
-
MMBtu
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$17,072
Cost:
$60,040
- - $17,072 5,164 -
-
kWh
$17,072
5,164
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,500
Cost:
$22,673
$12,500 - - - $12,500
-
kWh
-
-
MMBtu
04: 2.2311 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS Savings:
$7,558
Cost:
$8,500
- - $7,558 2,707 -
-
kWh
$7,558
2,707
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,000
Cost:
$1,000
$6,000 126,612 - - $6,000
126,612
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,240
Cost:
$3,890
$3,240 68,581 - - $3,240
68,581
kWh
-
-
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,880
Cost:
$1,290
- - $1,880 670 -
-
kWh
$1,880
670
MMBtu
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,330
Cost:
$3,655
- - $1,330 475 -
-
kWh
$1,330
475
MMBtu
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,056
Cost:
$430
- - $1,056 320 -
-
kWh
$1,056
320
MMBtu
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$918
Cost:
$772
$918 19,343 - - $918
19,343
kWh
-
-
MMBtu
11: 2.2514 COVER OPEN TANKS Savings:
$869
Cost:
$1,002
- - $869 309 -
-
kWh
$869
309
MMBtu
12: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$421
Cost:
$2,020
- - $421 193 -
-
kWh
$421
193
MMBtu
13: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$124
Cost:
-
$124 2,638 - - $124
2,638
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$58,932
Cost:
$109,805
$28,746 343,200 $30,186 9,838 $28,746
343,200
kWh
$30,186
9,838
MMBtu
TOTAL IMPLEMENTED Savings:
$6,124
Cost:
$1,000
$6,124 129,250 - - $6,124
129,250
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu