IAC logo
IAC Assessment: ND0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1993
Principal Product Aluminum and fiberglass truck caps
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 160,000
Annual Production 46,000 Pieces
Production Hrs. Annual 8,670
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,375 2,087,632 kWh $0.06
Natural Gas $116,976 24,947 MMBtu $4.69
TOTAL ENERGY COSTS $243,351
RECOMMENDED SAVINGS* $23,882 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,245
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$6,873
Cost:
$500
- - - - $6,873 - -
-
kWh
-
-
MMBtu
$6,873
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,341
Cost:
$200
$1,341 23,154 - - - - $1,341
23,154
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,100
Cost:
$2,000
$5,100 86,166 - - - - $5,100
86,166
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,550
Cost:
$730
$1,550 26,084 - - - - $1,550
26,084
kWh
-
-
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,381
Cost:
$3,268
$5,381 - - - - - $5,381
-
kWh
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$198
Cost:
$2,600
$198 3,517 - - - - $198
3,517
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$270
Cost:
$320
$270 4,396 - - - - $270
4,396
kWh
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$488
Cost:
$816
- - $488 109 - - -
-
kWh
$488
109
MMBtu
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$430
Cost:
$820
- - $430 96 - - -
-
kWh
$430
96
MMBtu
-
-
$
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,251
Cost:
$11,840
$2,251 - - - - - $2,251
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,882
Cost:
$23,094
$16,091 143,317 $918 205 $6,873 - $16,091
143,317
kWh
$918
205
MMBtu
$6,873
-
$
TOTAL IMPLEMENTED Savings:
$20,245
Cost:
$6,698
$13,372 135,404 - - $6,873 - $13,372
135,404
kWh
-
-
MMBtu
$6,873
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes