Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1994
Principal Product steel processing
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 200,000
Annual Production 576,000 Tons
Production Hrs. Annual 7,488
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $431,680 8,320,047 kWh $0.05
Natural Gas $87,850 23,092 MMBtu $3.80
TOTAL ENERGY COSTS $519,530
RECOMMENDED SAVINGS* $67,152 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$23,569
Cost:
$40,205
- - $23,569 7,606 -
-
kWh
$23,569
7,606
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,930
Cost:
$2,250
$17,930 345,545 - - $17,930
345,545
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$12,144
Cost:
$30,800
$12,144 467,761 - - $12,144
467,761
kWh
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,111
Cost:
$300
$7,111 137,163 - - $7,111
137,163
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,616
Cost:
$5,000
$3,616 80,305 - - $3,616
80,305
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,413
Cost:
$1,464
$2,413 46,893 - - $2,413
46,893
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$313
Cost:
$760
$313 6,155 - - $313
6,155
kWh
-
-
MMBtu
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$56
Cost:
$60
- - $56 15 -
-
kWh
$56
15
MMBtu
TOTAL RECOMMENDED Savings:
$67,152
Cost:
$80,839
$43,527 1,083,822 $23,625 7,621 $43,527
1,083,822
kWh
$23,625
7,621
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas