IAC logo
IAC Assessment: ND0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1995
Principal Product Sewing Patterns, Catalogs
NAICS n/a
SIC 2741 - Miscellaneous Publishing
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 760,000
Annual Production 5,300 Tons
Production Hrs. Annual 5,760
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $732,680 18,023,154 kWh $0.04
Natural Gas $318,691 92,791 MMBtu $3.43
TOTAL ENERGY COSTS $1,151,371
RECOMMENDED SAVINGS* $133,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $119,466
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$23,611
Cost:
$48,290
$23,611 456,624 - - - - $23,611
456,624
kWh
-
-
MMBtu
-
-
Tgal
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,837
Cost:
$5,000
- - $9,837 2,868 - - -
-
kWh
$9,837
2,868
MMBtu
-
-
Tgal
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$1,576
Cost:
$1,240
- - $1,576 460 - - -
-
kWh
$1,576
460
MMBtu
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,811
Cost:
$850
$1,811 44,549 - - - - $1,811
44,549
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7122 DISCONNECT BALLASTS Savings:
$1,465
Cost:
$4,733
$1,465 36,049 - - - - $1,465
36,049
kWh
-
-
MMBtu
-
-
Tgal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$615
Cost:
$1,500
$615 15,240 - - - - $615
15,240
kWh
-
-
MMBtu
-
-
Tgal
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$470
Cost:
-
$470 11,723 - - - - $470
11,723
kWh
-
-
MMBtu
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$197
Cost:
$600
$197 4,982 - - - - $197
4,982
kWh
-
-
MMBtu
-
-
Tgal
09: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$94,279
Cost:
$125,000
$279 6,741 - - $94,000 60,000,000 $279
6,741
kWh
-
-
MMBtu
$94,000
60,000,000
Tgal
TOTAL RECOMMENDED Savings:
$133,861
Cost:
$187,213
$28,448 575,908 $11,413 3,328 $94,000 60,000,000 $28,448
575,908
kWh
$11,413
3,328
MMBtu
$94,000
60,000,000
Tgal
TOTAL IMPLEMENTED Savings:
$119,466
Cost:
$174,530
$23,890 463,365 $1,576 460 $94,000 60,000,000 $23,890
463,365
kWh
$1,576
460
MMBtu
$94,000
60,000,000
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal