Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1995 |
Principal Product | newspaper inserts and advertising circulars |
NAICS | n/a |
SIC | 2725 - |
Sales | $5,000,000-$10,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 1,114,000,000 Pieces |
Production Hrs. Annual | 8,570 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $247,827 | 6,147,128 | kWh | $0.04 |
Natural Gas | $120,221 | 32,672 | MMBtu | $3.68 |
TOTAL ENERGY COSTS | $368,048 | |||
RECOMMENDED SAVINGS* | $31,389 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,428 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $144 Cost: - |
$144 | 2,931 | - | - | - | - | - | - |
$144 2,931 kWh |
- - MMBtu |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING |
Savings: $8,721 Cost: $200 |
$8,579 | 211,899 | - | - | $129 | 26 | $13 | 26 |
$8,579 211,899 kWh |
- - MMBtu |
$129 26 Tgal |
$13 26 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,150 Cost: $600 |
$1,150 | 28,429 | - | - | - | - | - | - |
$1,150 28,429 kWh |
- - MMBtu |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,186 Cost: $682 |
$1,186 | 29,308 | - | - | - | - | - | - |
$1,186 29,308 kWh |
- - MMBtu |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $20,050 Cost: $14,480 |
$20,050 | 495,604 | - | - | - | - | - | - |
$20,050 495,604 kWh |
- - MMBtu |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $98 Cost: $150 |
- | - | $98 | 26 | - | - | - | - |
- - kWh |
$98 26 MMBtu |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $40 Cost: $285 |
$40 | 879 | - | - | - | - | - | - |
$40 879 kWh |
- - MMBtu |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,389 Cost: $16,397 |
$31,149 | 769,050 | $98 | 26 | $129 | 26 | $13 | 26 | $31,149 769,050 kWh |
$98 26 MMBtu |
$129 26 Tgal |
$13 26 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,428 Cost: $832 |
$1,330 | 32,239 | $98 | 26 | - | - | - | - | $1,330 32,239 kWh |
$98 26 MMBtu |
- - Tgal |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Natural Gas | Water Disposal | Other Liquid (non-haz) |