Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1995 |
Principal Product | Auto Parts |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 89,000 |
Annual Production | 3,500,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $379,976 | 6,080,598 | kWh | $0.06 |
Natural Gas | $23,089 | 3,723 | MMBtu | $6.20 |
TOTAL ENERGY COSTS | $455,962 | |||
RECOMMENDED SAVINGS* | $72,550 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,157 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Liquid (non-haz) | Administrative Changes | Electricity Usage | Other Liquid (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $25,243 Cost: $818 |
$25,243 | 383,939 | - | - | - | - |
$25,243 383,939 kWh |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $19,644 Cost: $250 |
- | - | - | - | $19,644 | - |
- - kWh |
- - gal |
$19,644 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $11,204 Cost: $20,000 |
$11,204 | - | - | - | - | - |
$11,204 - kWh |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,513 Cost: $2,520 |
$8,513 | 129,543 | - | - | - | - |
$8,513 129,543 kWh |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,336 Cost: $500 |
$2,336 | 35,463 | - | - | - | - |
$2,336 35,463 kWh |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,021 Cost: $818 |
$1,021 | 15,533 | - | - | - | - |
$1,021 15,533 kWh |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $4,589 Cost: $660 |
- | - | $4,589 | 437 | - | - |
- - kWh |
$4,589 437 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,550 Cost: $25,566 |
$48,317 | 564,478 | $4,589 | 437 | $19,644 | - | $48,317 564,478 kWh |
$4,589 437 gal |
$19,644 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,157 Cost: $2,770 |
$8,513 | 129,543 | - | - | $19,644 | - | $8,513 129,543 kWh |
- - gal |
$19,644 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Liquid (non-haz) | Administrative Changes | Electricity Usage | Other Liquid (non-haz) | Administrative Changes |