IAC logo
IAC Assessment: ND0238
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0238
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1996
Principal Product Coil Springs
NAICS n/a
SIC 3490 -
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 84,000
Annual Production 37,302,194 Pieces
Production Hrs. Annual 2,423
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,203 1,751,465 kWh $0.06
Electricity Demand $58,656 6,410 kW-months/year $9.15
Electricity Fees $(-18,747) - $ -
Natural Gas $40,217 9,693 MMBtu $4.15
TOTAL ENERGY COSTS $184,213
RECOMMENDED SAVINGS* $19,726 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,628
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,350
Cost:
$480
$3,350 58,030 - - - - - - - - $3,350
58,030
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,194
Cost:
$14,890
$5,472 93,787 $3,722 376 - - - - - - $5,472
93,787
kWh
$3,722
376
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$779
Cost:
$1,000
- - - - - - $779 196 - - -
-
kWh
-
-
kW-months/year
-
-
$
$779
196
MMBtu
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,675
Cost:
$807
$1,091 19,343 $584 68 - - - - - - $1,091
19,343
kWh
$584
68
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$934
Cost:
$1,914
- - - - $934 - - - - - -
-
kWh
-
-
kW-months/year
$934
-
$
-
-
MMBtu
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$561
Cost:
$300
$561 9,086 - - - - - - - - $561
9,086
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$705
Cost:
$400
$447 7,913 $258 29 - - - - - - $447
7,913
kWh
$258
29
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$866
Cost:
$20
$466 7,620 $400 34 - - - - - - $466
7,620
kWh
$400
34
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
09: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$464
Cost:
-
- - - - $464 - - - - - -
-
kWh
-
-
kW-months/year
$464
-
$
-
-
MMBtu
-
-
lb
10: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$1,198
Cost:
$1,080
- - - - - - - - $1,198 6,640 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,198
6,640
lb
TOTAL RECOMMENDED Savings:
$19,726
Cost:
$20,891
$11,387 195,779 $4,964 507 $1,398 - $779 196 $1,198 6,640 $11,387
195,779
kWh
$4,964
507
kW-months/year
$1,398
-
$
$779
196
MMBtu
$1,198
6,640
lb
TOTAL IMPLEMENTED Savings:
$12,628
Cost:
$17,077
$7,124 122,216 $4,306 444 - - - - $1,198 6,640 $7,124
122,216
kWh
$4,306
444
kW-months/year
-
-
$
-
-
MMBtu
$1,198
6,640
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)