IAC logo
IAC Assessment: ND0240
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0240
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1996
Principal Product Fasteners
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 205
Plant Area (Sq.Ft.) 145,600
Annual Production 960,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,100 7,157,093 kWh $0.02
Electricity Demand $111,396 15,116 kW-months/year $7.37
Electricity Fees $(-3,342) - $ -
Natural Gas $70,927 22,133 MMBtu $3.20
TOTAL ENERGY COSTS $340,081
RECOMMENDED SAVINGS* $34,244 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,883
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,400
Cost:
$750
$2,400 64,185 - - - - - - $2,400
64,185
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$23,589
Cost:
$18,280
$16,637 444,900 $6,952 847 - - - - $16,637
444,900
kWh
$6,952
847
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$544
Cost:
$1,100
$384 10,258 $160 20 - - - - $384
10,258
kWh
$160
20
kW-months/year
-
-
$
-
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$15
Cost:
-
- - - - $15 - - - -
-
kWh
-
-
kW-months/year
$15
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$132
Cost:
$250
- - - - $132 - - - -
-
kWh
-
-
kW-months/year
$132
-
$
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$270
Cost:
$1,008
$270 7,327 - - - - - - $270
7,327
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,294
Cost:
$12,852
- - - - - - $7,294 - -
-
kWh
-
-
kW-months/year
-
-
$
$7,294
-
$
TOTAL RECOMMENDED Savings:
$34,244
Cost:
$34,240
$19,691 526,670 $7,112 867 $147 - $7,294 - $19,691
526,670
kWh
$7,112
867
kW-months/year
$147
-
$
$7,294
-
$
TOTAL IMPLEMENTED Savings:
$30,883
Cost:
$31,132
$16,637 444,900 $6,952 847 - - $7,294 - $16,637
444,900
kWh
$6,952
847
kW-months/year
-
-
$
$7,294
-
$