Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1996
Principal Product metal stampings
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 43,000
Annual Production 9,850,000 Pieces
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,965 1,635,404 kWh $0.03
Electricity Demand $34,197 4,095 kW-months/year $8.35
Electricity Fees $793 - $ -
Natural Gas $3,867 777 MMBtu $4.98
TOTAL ENERGY COSTS $93,459
RECOMMENDED SAVINGS* $6,752 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,354
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$350
Cost:
$200
$350 10,551 - - - - - - - - - - $350
10,551
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$490
Cost:
$1,200
$490 14,947 - - - - - - - - - - $490
14,947
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$180
Cost:
$540
$106 3,224 $72 9 $2 - - - - - - - $106
3,224
kWh
$72
9
kW-months/year
$2
-
$
-
-
MMBtu
-
-
gal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,046
Cost:
$80
$3,046 92,321 - - - - - - - - - - $3,046
92,321
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$90
Cost:
$756
$90 2,638 - - - - - - - - - - $90
2,638
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,218
Cost:
$967
$735 22,274 $472 57 $11 - - - - - - - $735
22,274
kWh
$472
57
kW-months/year
$11
-
$
-
-
MMBtu
-
-
gal
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$103
Cost:
$300
$153 2,931 - - - - $(-50) (-12) - - - - $153
2,931
kWh
-
-
kW-months/year
-
-
$
$(-50)
(-12)
MMBtu
-
-
gal
-
-
$
08: 3.4141 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE Savings:
$1,275
Cost:
$14,800
- - - - - - - - $637 - $638 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$637
-
gal
$638
-
$
TOTAL RECOMMENDED Savings:
$6,752
Cost:
$18,843
$4,970 148,886 $544 66 $13 - $(-50) (-12) $637 - $638 - $4,970
148,886
kWh
$544
66
kW-months/year
$13
-
$
$(-50)
(-12)
MMBtu
$637
-
gal
$638
-
$
TOTAL IMPLEMENTED Savings:
$4,354
Cost:
$1,803
$3,871 117,233 $472 57 $11 - - - - - - - $3,871
117,233
kWh
$472
57
kW-months/year
$11
-
$
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes