IAC logo
IAC Assessment: ND0251
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0251
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1996
Principal Product Steel Pieces
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 40,000
Annual Production 8,000,000 Pounds
Production Hrs. Annual 7,104
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,531 754,982 kWh $0.04
Electricity Demand $26,020 2,317 kW-months/year $11.23
Electricity Fees $290 - $ -
Natural Gas $9,197 2,157 MMBtu $4.26
TOTAL ENERGY COSTS $88,224
RECOMMENDED SAVINGS* $28,591 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$263
Cost:
$397
$139 2,345 $124 11 - - - - $139
2,345
kWh
$124
11
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$149
Cost:
$200
$149 3,810 - - - - - - $149
3,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$57
Cost:
$84
$57 1,465 - - - - - - $57
1,465
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$42
Cost:
$7
$42 1,172 - - - - - - $42
1,172
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$409
Cost:
$850
- - - - $409 96 - - -
-
kWh
-
-
kW-months/year
$409
96
MMBtu
-
-
gal
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,312
Cost:
$300
$1,225 31,360 $1,087 97 - - - - $1,225
31,360
kWh
$1,087
97
kW-months/year
-
-
MMBtu
-
-
gal
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,969
Cost:
$4,450
$1,574 40,152 $1,395 124 - - - - $1,574
40,152
kWh
$1,395
124
kW-months/year
-
-
MMBtu
-
-
gal
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$39
Cost:
$60
$39 879 - - - - - - $39
879
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,292
Cost:
$360
$1,292 33,118 - - - - - - $1,292
33,118
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,510
Cost:
$360
- - - - $2,510 589 - - -
-
kWh
-
-
kW-months/year
$2,510
589
MMBtu
-
-
gal
11: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$18,549
Cost:
$660
- - - - - - $18,549 1,584 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,549
1,584
gal
TOTAL RECOMMENDED Savings:
$28,591
Cost:
$7,728
$4,517 114,301 $2,606 232 $2,919 685 $18,549 1,584 $4,517
114,301
kWh
$2,606
232
kW-months/year
$2,919
685
MMBtu
$18,549
1,584
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)