IAC logo
IAC Assessment: ND0252
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0252
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1996
Principal Product heaters
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $1,000,000-$5,000,000
# of Employees 125
Plant Area (Sq.Ft.) 34,400
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,816 1,260,258 kWh $0.07
Electricity Demand $21,196 2,522 kW-months/year $8.40
Electricity Fees $(-8,976) - $ -
Natural Gas $10,067 2,444 MMBtu $4.12
TOTAL ENERGY COSTS $105,103
RECOMMENDED SAVINGS* $9,864 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,073
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,615
Cost:
$500
$1,178 19,050 $437 45 - - - - - - $1,178
19,050
kWh
$437
45
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$562
Cost:
$670
$365 7,034 $197 15 - - - - - - $365
7,034
kWh
$197
15
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$447
Cost:
$1,000
$447 7,327 - - - - - - - - $447
7,327
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$223
Cost:
$67
$223 3,517 - - - - - - - - $223
3,517
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
05: 2.8112 COMBINE UTILITY METERS Savings:
$1,562
Cost:
$4,000
- - - - $1,562 - - - - - -
-
kWh
-
-
kW-months/year
$1,562
-
$
-
-
MMBtu
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$285
Cost:
$540
$209 3,224 $76 32 - - - - - - $209
3,224
kWh
$76
32
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$887
Cost:
$100
$887 14,361 - - - - - - - - $887
14,361
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$167
Cost:
$1,000
$153 2,345 $58 6 - - $(-44) (-11) - - $153
2,345
kWh
$58
6
kW-months/year
-
-
$
$(-44)
(-11)
MMBtu
-
-
lb
09: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$4,116
Cost:
$800
- - - - - - - - $4,116 200 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$4,116
200
lb
TOTAL RECOMMENDED Savings:
$9,864
Cost:
$8,677
$3,462 56,858 $768 98 $1,562 - $(-44) (-11) $4,116 200 $3,462
56,858
kWh
$768
98
kW-months/year
$1,562
-
$
$(-44)
(-11)
MMBtu
$4,116
200
lb
TOTAL IMPLEMENTED Savings:
$6,073
Cost:
$2,177
$1,684 28,136 $273 47 - - - - $4,116 200 $1,684
28,136
kWh
$273
47
kW-months/year
-
-
$
-
-
MMBtu
$4,116
200
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)