IAC logo
IAC Assessment: ND0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1996
Principal Product Fabricated Metal Parts
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 92
Plant Area (Sq.Ft.) 80,000
Annual Production 6,500,000 Pieces
Production Hrs. Annual 4,160
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,617 1,037,222 kWh $0.06
Electricity Demand $12,830 3,248 kW-months/year $3.95
Electricity Fees $2,078 - $ -
Natural Gas $6,887 1,541 MMBtu $4.47
TOTAL ENERGY COSTS $89,760
RECOMMENDED SAVINGS* $8,262 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,335
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$543
Cost:
$360
$543 9,672 - - - - - - $543
9,672
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$843
Cost:
$180
$843 15,240 - - - - - - $843
15,240
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$333
Cost:
$515
- - - - $333 75 - - -
-
kWh
-
-
kW-months/year
$333
75
MMBtu
-
-
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$105
Cost:
$100
$56 1,172 $49 13 - - - - $56
1,172
kWh
$49
13
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$51
Cost:
$360
$42 879 $9 2 - - - - $42
879
kWh
$9
2
kW-months/year
-
-
MMBtu
-
-
gal
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$216
Cost:
$1,050
$216 3,810 - - - - - - $216
3,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,514
Cost:
$3,650
$1,239 22,274 $275 70 - - - - $1,239
22,274
kWh
$275
70
kW-months/year
-
-
MMBtu
-
-
gal
08: 3.7211 MODIFY MATERIAL APPLICATION METHODS Savings:
$4,657
Cost:
$11,800
- - - - - - $4,657 1,265 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,657
1,265
gal
TOTAL RECOMMENDED Savings:
$8,262
Cost:
$18,015
$2,939 53,047 $333 85 $333 75 $4,657 1,265 $2,939
53,047
kWh
$333
85
kW-months/year
$333
75
MMBtu
$4,657
1,265
gal
TOTAL IMPLEMENTED Savings:
$7,335
Cost:
$16,780
$2,354 42,496 $324 83 - - $4,657 1,265 $2,354
42,496
kWh
$324
83
kW-months/year
-
-
MMBtu
$4,657
1,265
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)