IAC Assessment: ND0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1996
Principal Product Prefabricated Homes
NAICS n/a
SIC 2451 - Mobile Homes
Sales $10,000,000-$50,000,000
# of Employees 131
Plant Area (Sq.Ft.) 100,000
Annual Production 12,000 Units
Production Hrs. Annual 2,080
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,926 612,544 kWh $0.05
Electricity Demand $9,654 2,262 kW-months/year $4.27
Natural Gas $18,729 4,464 MMBtu $4.20
TOTAL ENERGY COSTS $57,309
RECOMMENDED SAVINGS* $9,653 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,082
Cost:
$190
$1,562 32,239 $520 121 - - - - $1,562
32,239
kWh
$520
121
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$181
Cost:
$200
$181 3,810 - - - - - - $181
3,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$135
Cost:
$248
$102 1,465 $33 8 - - - - $102
1,465
kWh
$33
8
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,435
Cost:
$545
$5,435 115,182 - - - - - - $5,435
115,182
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$191
Cost:
$800
$191 4,103 - - - - - - $191
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58
Cost:
$640
$58 879 - - - - - - $58
879
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$162
Cost:
$300
$224 3,517 - - $(-62) (-15) - - $224
3,517
kWh
-
-
kW-months/year
$(-62)
(-15)
MMBtu
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$639
Cost:
$420
$639 13,482 - - - - - - $639
13,482
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$770
Cost:
$475
- - - - - - $770 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$770
-
$
TOTAL RECOMMENDED Savings:
$9,653
Cost:
$3,818
$8,392 174,677 $553 129 $(-62) (-15) $770 - $8,392
174,677
kWh
$553
129
kW-months/year
$(-62)
(-15)
MMBtu
$770
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost