IAC logo
IAC Assessment: ND0270
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0270
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1997
Principal Product Machined metal products
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 37,000
Annual Production 500,000 Pieces
Production Hrs. Annual 2,080
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,016 385,404 kWh $0.06
Natural Gas $8,694 2,035 MMBtu $4.27
TOTAL ENERGY COSTS $31,710
RECOMMENDED SAVINGS* $3,358 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$227
Cost:
$245
- - $227 52 - - - - -
-
kWh
$227
52
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$360
Cost:
$900
$360 6,448 - - - - - - $360
6,448
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$61
Cost:
$170
- - $61 14 - - - - -
-
kWh
$61
14
MMBtu
-
-
$
-
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$250
Cost:
$700
$250 5,862 - - - - - - $250
5,862
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$149
Cost:
$400
$149 2,638 - - - - - - $149
2,638
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$380
Cost:
$200
$380 6,155 - - - - - - $380
6,155
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$131
Cost:
-
$131 3,224 - - - - - - $131
3,224
kWh
-
-
MMBtu
-
-
$
-
-
$
08: 2.8112 COMBINE UTILITY METERS Savings:
$720
Cost:
$2,880
- - - - $720 - - - -
-
kWh
-
-
MMBtu
$720
-
$
-
-
$
09: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$134
Cost:
$160
- - - - $134 - - - -
-
kWh
-
-
MMBtu
$134
-
$
-
-
$
10: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$765
Cost:
$982
- - $765 180 - - - - -
-
kWh
$765
180
MMBtu
-
-
$
-
-
$
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$72
Cost:
-
- - - - - - $72 - -
-
kWh
-
-
MMBtu
-
-
$
$72
-
$
12: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$109
Cost:
-
- - - - - - $109 - -
-
kWh
-
-
MMBtu
-
-
$
$109
-
$
TOTAL RECOMMENDED Savings:
$3,358
Cost:
$6,637
$1,270 24,327 $1,053 246 $854 - $181 - $1,270
24,327
kWh
$1,053
246
MMBtu
$854
-
$
$181
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Administrative Changes Ancillary Material Cost