IAC logo
IAC Assessment: ND0271
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1997
Principal Product Welded Steel Tubing
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $5,000,000-$10,000,000
# of Employees 92
Plant Area (Sq.Ft.) 120,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,114 3,345,838 kWh $0.02
Electricity Demand $135,178 11,181 kW-months/year $12.09
Natural Gas $110,846 28,385 MMBtu $3.91
TOTAL ENERGY COSTS $311,138
RECOMMENDED SAVINGS* $9,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,549
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,984
Cost:
$718
$640 33,705 $1,344 67 - - - - - - $640
33,705
kWh
$1,344
67
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$462
Cost:
$200
$462 7,620 - - - - - - - - $462
7,620
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$118
Cost:
$200
$118 2,052 - - - - - - - - $118
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,804
Cost:
$420
$4,804 80,305 - - - - - - - - $4,804
80,305
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$327
Cost:
$124
- - - - $327 84 - - - - -
-
kWh
-
-
kW-months/year
$327
84
MMBtu
-
-
gal
-
-
lb
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$140
Cost:
$155
- - - - $140 36 - - - - -
-
kWh
-
-
kW-months/year
$140
36
MMBtu
-
-
gal
-
-
lb
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$591
Cost:
$463
$188 9,672 $403 400 - - - - - - $188
9,672
kWh
$403
400
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$506
Cost:
$100
$506 8,499 - - - - - - - - $506
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
09: 3.1121 USE MORE EFFICIENT ADHESIVE APPLICATORS Savings:
$381
Cost:
$360
- - - - - - - - $381 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$381
-
lb
10: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$109
Cost:
-
- - - - - - $109 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$109
-
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$9,422
Cost:
$2,740
$6,718 141,853 $1,747 467 $467 120 $109 - $381 - $6,718
141,853
kWh
$1,747
467
kW-months/year
$467
120
MMBtu
$109
-
gal
$381
-
lb
TOTAL IMPLEMENTED Savings:
$8,549
Cost:
$2,285
$6,094 131,302 $1,747 467 $327 84 - - $381 - $6,094
131,302
kWh
$1,747
467
kW-months/year
$327
84
MMBtu
-
-
gal
$381
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)