IAC logo
IAC Assessment: ND0273
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0273
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1997
Principal Product Books
NAICS n/a
SIC 2730 -
Sales $50,000,000-$100,000,000
# of Employees 148
Plant Area (Sq.Ft.) 384,000
Annual Production 95,700,000 Pieces
Production Hrs. Annual 4,080
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,816 2,833,529 kWh $0.02
Electricity Demand $69,587 6,359 kW-months/year $10.94
Electricity Fees $6,120 - $ -
Natural Gas $37,947 7,567 MMBtu $5.01
TOTAL ENERGY COSTS $168,970
RECOMMENDED SAVINGS* $179,433 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $174,985
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,216
Cost:
$3,300
- - $2,216 480 - - - - - - - - - - - - -
-
kWh
$2,216
480
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$355
Cost:
$715
$143 3,517 $194 20 $18 - - - - - - - - - - - $143
3,517
kWh
$194
20
kW-months/year
$18
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$54
Cost:
$1,125
$21 1,172 $30 3 $3 - - - - - - - - - - - $21
1,172
kWh
$30
3
kW-months/year
$3
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$97
Cost:
$400
$97 5,275 - - - - - - - - - - - - - - $97
5,275
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,271
Cost:
$688
$509 27,843 $699 70 $63 - - - - - - - - - - - $509
27,843
kWh
$699
70
kW-months/year
$63
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,873
Cost:
$1,155
$751 41,032 $1,029 103 $93 - - - - - - - - - - - $751
41,032
kWh
$1,029
103
kW-months/year
$93
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$116,808
Cost:
$15,230
$4,559 222,743 $5,577 559 - - - - - - $(-13,328) - - - $120,000 - $4,559
222,743
kWh
$5,577
559
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$(-13,328)
-
$
-
-
$
$120,000
-
$
08: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$51,750
Cost:
$3,780
- - - - - - - - - - - - $6,750 - $45,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$6,750
-
$
$45,000
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$82
Cost:
$395
- - - - - - $82 16 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$82
16
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$82
Cost:
$350
$82 4,396 - - - - - - - - - - - - - - $82
4,396
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,719
Cost:
$5,060
$1,889 103,751 $2,605 261 $225 - - - - - - - - - - - $1,889
103,751
kWh
$2,605
261
kW-months/year
$225
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$126
Cost:
-
- - - - - - - - $126 7 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$126
7
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$179,433
Cost:
$32,198
$8,051 409,729 $12,350 1,496 $402 - $82 16 $126 7 $(-13,328) - $6,750 - $165,000 - $8,051
409,729
kWh
$12,350
1,496
kW-months/year
$402
-
$
$82
16
MMBtu
$126
7
lb
$(-13,328)
-
$
$6,750
-
$
$165,000
-
$
TOTAL IMPLEMENTED Savings:
$174,985
Cost:
$25,868
$7,100 357,854 $9,075 910 $306 - $82 16 - - $(-13,328) - $6,750 - $165,000 - $7,100
357,854
kWh
$9,075
910
kW-months/year
$306
-
$
$82
16
MMBtu
-
-
lb
$(-13,328)
-
$
$6,750
-
$
$165,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product