IAC logo
IAC Assessment: ND0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1997
Principal Product Target Missiles
NAICS n/a
SIC 3489 - Ordnance And Accessories, Nec
Sales $10,000,000-$50,000,000
# of Employees 149
Plant Area (Sq.Ft.) 82,000
Annual Production 24 Pieces
Production Hrs. Annual 2,625
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,364 2,235,932 kWh $0.05
Electricity Demand $24,670 6,920 kW-months/year $3.57
Natural Gas $5,961 930 MMBtu $6.41
TOTAL ENERGY COSTS $152,551
RECOMMENDED SAVINGS* $76,327 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,281
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ Tgal $ gal $ lb $ $ $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$25,063
Cost:
$75,000
- - - - $25,063 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$25,063
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$19,775
Cost:
$7,000
$11,673 254,982 $3,102 870 - - - - - - - - $5,000 - - - - - $11,673
254,982
kWh
$3,102
870
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
$5,000
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,005
Cost:
$36,799
$5,043 109,027 $1,962 550 - - - - - - - - - - - - - - $5,043
109,027
kWh
$1,962
550
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,570
Cost:
$1,500
$6,570 142,438 - - - - - - - - - - - - - - - - $6,570
142,438
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,396
Cost:
$1,000
$2,684 58,617 $712 200 - - - - - - - - - - - - - - $2,684
58,617
kWh
$712
200
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,092
Cost:
$1,388
$436 7,620 - - - - - - - - - - $324 - - - $332 - $436
7,620
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
$324
-
$
-
-
$
$332
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$872
Cost:
$400
$684 14,947 $188 53 - - - - - - - - - - - - - - $684
14,947
kWh
$188
53
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$405
Cost:
$1,140
$322 7,034 $83 23 - - - - - - - - - - - - - - $322
7,034
kWh
$83
23
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$196
Cost:
$100
$161 3,517 $35 10 - - - - - - - - - - - - - - $161
3,517
kWh
$35
10
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$174
Cost:
-
$174 3,810 - - - - - - - - - - - - - - - - $174
3,810
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$173
Cost:
$200
$173 3,810 - - - - - - - - - - - - - - - - $173
3,810
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
12: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$8,276
Cost:
$10,000
- - - - - - $8,276 3,726,994 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,276
3,726,994
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$450
Cost:
-
- - - - - - - - - - $450 12,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
$450
12,000
lb
-
-
$
-
-
$
-
-
$
14: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$300
Cost:
$200
- - - - - - - - $300 5 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$300
5
gal
-
-
lb
-
-
$
-
-
$
-
-
$
15: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,580
Cost:
-
- - - - - - - - - - - - - - $2,580 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$2,580
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$76,327
Cost:
$134,727
$27,920 605,802 $6,082 1,706 $25,063 - $8,276 3,726,994 $300 5 $450 12,000 $5,324 - $2,580 - $332 - $27,920
605,802
kWh
$6,082
1,706
kW-months/year
$25,063
-
$
$8,276
3,726,994
Tgal
$300
5
gal
$450
12,000
lb
$5,324
-
$
$2,580
-
$
$332
-
$
TOTAL IMPLEMENTED Savings:
$15,281
Cost:
$46,799
$5,043 109,027 $1,962 550 - - $8,276 3,726,994 - - - - - - - - - - $5,043
109,027
kWh
$1,962
550
kW-months/year
-
-
$
$8,276
3,726,994
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Water Disposal Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost