IAC Assessment: ND0282
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0282
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1997
Principal Product agricultural grain dryers
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 177,000
Annual Production 2,000 Pieces
Production Hrs. Annual 4,850
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,634 2,316,530 kWh $0.06
Natural Gas $74,503 17,984 MMBtu $4.14
TOTAL ENERGY COSTS $203,137
RECOMMENDED SAVINGS* $18,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,111
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Other Liquid (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ gal $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$8,615
Cost:
$500
- - - - $8,615 - - - -
-
kWh
-
-
gal
$8,615
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,081
Cost:
$1,292
$1,081 18,464 - - - - - - $1,081
18,464
kWh
-
-
gal
-
-
$
-
-
$
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$3,450
Cost:
$1,000
- - $3,450 115 - - - - -
-
kWh
$3,450
115
gal
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,130
Cost:
$1,005
$1,130 18,171 - - - - - - $1,130
18,171
kWh
-
-
gal
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,055
Cost:
$500
$1,055 18,171 - - - - - - $1,055
18,171
kWh
-
-
gal
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$866
Cost:
$460
$866 14,947 - - - - - - $866
14,947
kWh
-
-
gal
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$724
Cost:
$1,000
$724 11,430 - - - - - - $724
11,430
kWh
-
-
gal
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$571
Cost:
$108
$571 7,327 - - - - - - $571
7,327
kWh
-
-
gal
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$482
Cost:
$910
$482 3,810 - - - - - - $482
3,810
kWh
-
-
gal
-
-
$
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$360
Cost:
-
- - - - - - $360 - -
-
kWh
-
-
gal
-
-
$
$360
-
$
11: 2.7122 DISCONNECT BALLASTS Savings:
$92
Cost:
$150
$92 1,465 - - - - - - $92
1,465
kWh
-
-
gal
-
-
$
-
-
$
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$72
Cost:
$50
$72 1,172 - - - - - - $72
1,172
kWh
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$18,498
Cost:
$6,975
$6,073 94,957 $3,450 115 $8,615 - $360 - $6,073
94,957
kWh
$3,450
115
gal
$8,615
-
$
$360
-
$
TOTAL IMPLEMENTED Savings:
$2,111
Cost:
$1,952
$2,111 36,048 - - - - - - $2,111
36,048
kWh
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ gal $ $ $ $
Electricity Usage Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Other Liquid (non-haz) Administrative Changes Ancillary Material Cost