IAC Assessment: ND0286
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0286
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1997
Principal Product Diesel Tubes
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 135,000
Annual Production 2,150,000 Pieces
Production Hrs. Annual 5,700
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,100 3,603,165 kWh $0.04
Electricity Demand $32,451 3,701 kW-months/year $8.77
Natural Gas $47,003 11,537 MMBtu $4.07
TOTAL ENERGY COSTS $241,124
RECOMMENDED SAVINGS* $59,714 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,378
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$21,000
Cost:
$5,000
- - - - - - - - - - - - - - $21,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$21,000
-
$
-
-
$
02: 2.8112 COMBINE UTILITY METERS Savings:
$14,973
Cost:
$29,946
- - - - - - - - - - - - $14,973 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
$14,973
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,889
Cost:
$10,720
$4,491 156,800 $3,398 330 - - - - - - - - - - - - - - $4,491
156,800
kWh
$3,398
330
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,505
Cost:
$2,836
- - - - $5,505 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,505
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,841
Cost:
$480
- - - - - - - - - - - - $1,841 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
$1,841
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,127
Cost:
$300
$865 19,343 $262 30 - - - - - - - - - - - - - - $865
19,343
kWh
$262
30
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,059
Cost:
$295
$825 18,464 $234 27 - - - - - - - - - - - - - - $825
18,464
kWh
$234
27
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$502
Cost:
$2,000
- - - - - - - - - - - - - - - - $502 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
$502
-
$
09: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$502
Cost:
$2,000
- - - - - - - - - - - - - - - - $502 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
$502
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$467
Cost:
$1,782
- - - - - - $467 111 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$467
111
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$195
Cost:
$440
$118 2,638 $77 9 - - - - - - - - - - - - - - $118
2,638
kWh
$77
9
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
12: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$347
Cost:
$400
- - - - - - $347 82 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$347
82
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
13: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$54
Cost:
-
- - - - - - - - - - - - $54 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
$54
-
$
-
-
$
-
-
$
14: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$47
Cost:
-
$47 879 - - - - - - - - - - - - - - - - $47
879
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
15: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,625
Cost:
-
- - - - - - - - - - $2,625 70,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$2,625
70,000
lb
-
-
$
-
-
$
-
-
$
16: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$888
Cost:
$54
- - - - - - - - - - $888 180,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$888
180,000
lb
-
-
$
-
-
$
-
-
$
17: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$693
Cost:
$44
- - - - - - - - $693 88 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$693
88
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$59,714
Cost:
$56,297
$6,346 198,124 $3,971 396 $5,505 - $814 193 $693 88 $3,513 250,000 $16,868 - $21,000 - $1,004 - $6,346
198,124
kWh
$3,971
396
kW-months/year
$5,505
-
$
$814
193
MMBtu
$693
88
gal
$3,513
250,000
lb
$16,868
-
$
$21,000
-
$
$1,004
-
$
TOTAL IMPLEMENTED Savings:
$38,378
Cost:
$23,195
$6,228 195,486 $3,894 387 $5,505 - - - $693 88 - - $54 - $21,000 - $1,004 - $6,228
195,486
kWh
$3,894
387
kW-months/year
$5,505
-
$
-
-
MMBtu
$693
88
gal
-
-
lb
$54
-
$
$21,000
-
$
$1,004
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Primary Raw Material Primary Product