IAC logo
IAC Assessment: ND0292
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0292
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1998
Principal Product Orthopedic Instruments
NAICS n/a
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 202
Plant Area (Sq.Ft.) 51,000
Annual Production 77,000 Pounds
Production Hrs. Annual 7,344
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,457 4,183,763 kWh $0.05
Electricity Demand $81,508 7,858 kW-months/year $10.37
Electricity Fees $(-51,171) - $ -
Natural Gas $9,814 1,846 MMBtu $5.32
TOTAL ENERGY COSTS $262,608
RECOMMENDED SAVINGS* $15,492 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,492
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,922
Cost:
$2,510
$1,457 27,550 $465 45 - - - - - - $1,457
27,550
kWh
$465
45
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,468
Cost:
$338
- - - - - - $2,468 464 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,468
464
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,452
Cost:
$6,303
$1,142 21,395 $1,310 126 - - - - - - $1,142
21,395
kWh
$1,310
126
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,679
Cost:
$80
$1,479 27,843 $200 19 - - - - - - $1,479
27,843
kWh
$200
19
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,312
Cost:
$950
$1,168 21,981 $144 14 - - - - - - $1,168
21,981
kWh
$144
14
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$911
Cost:
$900
$420 7,913 $65 6 - - - - $426 - $420
7,913
kWh
$65
6
kW-months/year
-
-
$
-
-
MMBtu
$426
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$301
Cost:
$208
$157 4,396 $105 12 - - - - $39 - $157
4,396
kWh
$105
12
kW-months/year
-
-
$
-
-
MMBtu
$39
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$96
Cost:
-
$96 1,758 - - - - - - - - $96
1,758
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$59
Cost:
$350
- - - - $59 - - - - - -
-
kWh
-
-
kW-months/year
$59
-
$
-
-
MMBtu
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,292
Cost:
$9,475
- - - - $4,292 - - - - - -
-
kWh
-
-
kW-months/year
$4,292
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$15,492
Cost:
$21,114
$5,919 112,836 $2,289 222 $4,351 - $2,468 464 $465 - $5,919
112,836
kWh
$2,289
222
kW-months/year
$4,351
-
$
$2,468
464
MMBtu
$465
-
$
TOTAL IMPLEMENTED Savings:
$15,492
Cost:
$21,114
$5,919 112,836 $2,289 222 $4,351 - $2,468 464 $465 - $5,919
112,836
kWh
$2,289
222
kW-months/year
$4,351
-
$
$2,468
464
MMBtu
$465
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost