IAC logo
IAC Assessment: ND0293
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0293
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1998
Principal Product Dental Supplies
NAICS n/a
SIC 3843 - Dental Equipment And Supplies
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 2,500
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,059 3,002,345 kWh $0.04
Electricity Demand $67,051 8,923 kW-months/year $7.51
Natural Gas $72,586 11,535 MMBtu $6.29
TOTAL ENERGY COSTS $246,696
RECOMMENDED SAVINGS* $35,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,835
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,616
Cost:
$28,682
$3,633 103,751 $3,983 527 - - - - $3,633
103,751
kWh
$3,983
527
kW-months/year
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,449
Cost:
$5,790
$1,328 43,962 $2,121 236 - - - - $1,328
43,962
kWh
$2,121
236
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,748
Cost:
$2,860
$460 12,896 $366 49 - - $922 - $460
12,896
kWh
$366
49
kW-months/year
-
-
$
$922
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$1,052
Cost:
$500
$1,052 36,049 - - - - - - $1,052
36,049
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$823
Cost:
$800
$491 13,775 $332 44 - - - - $491
13,775
kWh
$332
44
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$638
Cost:
$100
$376 10,551 $262 35 - - - - $376
10,551
kWh
$262
35
kW-months/year
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$481
Cost:
$800
$387 7,913 $94 13 - - - - $387
7,913
kWh
$94
13
kW-months/year
-
-
$
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$452
Cost:
$340
$271 7,620 $181 24 - - - - $271
7,620
kWh
$181
24
kW-months/year
-
-
$
-
-
$
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$82
Cost:
$167
$82 2,052 - - - - - - $82
2,052
kWh
-
-
kW-months/year
-
-
$
-
-
$
10: 2.8112 COMBINE UTILITY METERS Savings:
$9,790
Cost:
$19,581
- - - - $9,790 - - - -
-
kWh
-
-
kW-months/year
$9,790
-
$
-
-
$
11: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$8,731
Cost:
$600
- - - - $8,731 - - - -
-
kWh
-
-
kW-months/year
$8,731
-
$
-
-
$
12: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$510
Cost:
-
- - - - $510 - - - -
-
kWh
-
-
kW-months/year
$510
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$35,372
Cost:
$60,220
$8,080 238,569 $7,339 928 $19,031 - $922 - $8,080
238,569
kWh
$7,339
928
kW-months/year
$19,031
-
$
$922
-
$
TOTAL IMPLEMENTED Savings:
$5,835
Cost:
$8,750
$2,164 67,409 $2,749 320 - - $922 - $2,164
67,409
kWh
$2,749
320
kW-months/year
-
-
$
$922
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost