IAC logo
IAC Assessment: ND0296
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0296
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1998
Principal Product HVAC equipment
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 73,000
Annual Production 10,000 Pieces
Production Hrs. Annual 4,000
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,607 847,597 kWh $0.06
Electricity Demand $24,069 2,965 kW-months/year $8.12
Electricity Fees $(-5,547) - $ -
Natural Gas $36,430 7,789 MMBtu $4.68
TOTAL ENERGY COSTS $107,559
RECOMMENDED SAVINGS* $43,799 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,126
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,045
Cost:
$14,258
$4,720 76,202 $2,325 24 - - - - $4,720
76,202
kWh
$2,325
24
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,246
Cost:
$126
- - - - $1,246 266 - - -
-
kWh
-
-
kW-months/year
$1,246
266
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,097
Cost:
$180
$1,097 13,189 - - - - - - $1,097
13,189
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$880
Cost:
$854
- - - - $880 188 - - -
-
kWh
-
-
kW-months/year
$880
188
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$799
Cost:
$1,520
$574 9,379 $225 28 - - - - $574
9,379
kWh
$225
28
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$231
Cost:
$330
$231 1,465 - - - - - - $231
1,465
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$229
Cost:
$50
$229 3,810 - - - - - - $229
3,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$119
Cost:
$406
- - - - $119 27 - - -
-
kWh
-
-
kW-months/year
$119
27
MMBtu
-
-
$
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$73
Cost:
$93
$73 1,172 - - - - - - $73
1,172
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$30,000
Cost:
$25,000
- - - - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,000
-
$
11: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$2,080
Cost:
-
- - - - - - $2,080 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,080
-
$
TOTAL RECOMMENDED Savings:
$43,799
Cost:
$42,817
$6,924 105,217 $2,550 52 $2,245 481 $32,080 - $6,924
105,217
kWh
$2,550
52
kW-months/year
$2,245
481
MMBtu
$32,080
-
$
TOTAL IMPLEMENTED Savings:
$2,126
Cost:
$980
- - - - $2,126 454 - - -
-
kWh
-
-
kW-months/year
$2,126
454
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes