Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1998 |
Principal Product | HVAC equipment |
NAICS | n/a |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 73,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $52,607 | 847,597 | kWh | $0.06 |
Electricity Demand | $24,069 | 2,965 | kW-months/year | $8.12 |
Electricity Fees | $(-5,547) | - | $ | - |
Natural Gas | $36,430 | 7,789 | MMBtu | $4.68 |
TOTAL ENERGY COSTS | $107,559 | |||
RECOMMENDED SAVINGS* | $43,799 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,126 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,045 Cost: $14,258 |
$4,720 | 76,202 | $2,325 | 24 | - | - | - | - |
$4,720 76,202 kWh |
$2,325 24 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,246 Cost: $126 |
- | - | - | - | $1,246 | 266 | - | - |
- - kWh |
- - kW-months/year |
$1,246 266 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,097 Cost: $180 |
$1,097 | 13,189 | - | - | - | - | - | - |
$1,097 13,189 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $880 Cost: $854 |
- | - | - | - | $880 | 188 | - | - |
- - kWh |
- - kW-months/year |
$880 188 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $799 Cost: $1,520 |
$574 | 9,379 | $225 | 28 | - | - | - | - |
$574 9,379 kWh |
$225 28 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $231 Cost: $330 |
$231 | 1,465 | - | - | - | - | - | - |
$231 1,465 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $229 Cost: $50 |
$229 | 3,810 | - | - | - | - | - | - |
$229 3,810 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $119 Cost: $406 |
- | - | - | - | $119 | 27 | - | - |
- - kWh |
- - kW-months/year |
$119 27 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $73 Cost: $93 |
$73 | 1,172 | - | - | - | - | - | - |
$73 1,172 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $30,000 Cost: $25,000 |
- | - | - | - | - | - | $30,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$30,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $2,080 Cost: - |
- | - | - | - | - | - | $2,080 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,799 Cost: $42,817 |
$6,924 | 105,217 | $2,550 | 52 | $2,245 | 481 | $32,080 | - | $6,924 105,217 kWh |
$2,550 52 kW-months/year |
$2,245 481 MMBtu |
$32,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,126 Cost: $980 |
- | - | - | - | $2,126 | 454 | - | - | - - kWh |
- - kW-months/year |
$2,126 454 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |