IAC logo
IAC Assessment: ND0310
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0310
IAC Center Notre Dame Univ.
Assessment Year 1998
Principal Product Printed Sheets for Aerosol Cans
NAICS n/a
SIC 2796 - Platemaking Services
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 190,000
Annual Production 98,000,000 Pieces
Production Hrs. Annual 6,384
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $435,130 10,740,328 kWh $0.04
Natural Gas $594,320 206,736 MMBtu $2.87
TOTAL ENERGY COSTS $1,029,450
RECOMMENDED SAVINGS* $113,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,720
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Primary Raw Material By-product Production Electricity Usage Natural Gas Administrative Changes Primary Raw Material By-product Production
$ kWh $ MMBtu $ $ $ $ $ $
01: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$9,419
Cost:
$24,900
- - $9,419 3,282 - - - - - - -
-
kWh
$9,419
3,282
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$27,164
Cost:
$9,600
$(-233) (-5,862) $27,397 9,546 - - - - - - $(-233)
(-5,862)
kWh
$27,397
9,546
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$56,650
Cost:
$65,000
- - - - - - $56,650 - - - -
-
kWh
-
-
MMBtu
-
-
$
$56,650
-
$
-
-
$
04: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$1,487
Cost:
-
- - $1,487 518 - - - - - - -
-
kWh
$1,487
518
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,890
Cost:
$8,263
$1,890 46,307 - - - - - - - - $1,890
46,307
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$501
Cost:
$880
$217 5,275 - - $284 - - - - - $217
5,275
kWh
-
-
MMBtu
$284
-
$
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,001
Cost:
$600
$1,001 24,619 - - - - - - - - $1,001
24,619
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$60
Cost:
$200
$83 2,052 $(-23) (-8) - - - - - - $83
2,052
kWh
$(-23)
(-8)
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$2
Cost:
-
$2 293 - - - - - - - - $2
293
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$15,186
Cost:
$42,730
- - - - - - - - $15,186 - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
$15,186
-
$
TOTAL RECOMMENDED Savings:
$113,360
Cost:
$152,173
$2,960 72,684 $38,280 13,338 $284 - $56,650 - $15,186 - $2,960
72,684
kWh
$38,280
13,338
MMBtu
$284
-
$
$56,650
-
$
$15,186
-
$
TOTAL IMPLEMENTED Savings:
$94,720
Cost:
$99,500
$(-233) (-5,862) $38,303 13,346 - - $56,650 - - - $(-233)
(-5,862)
kWh
$38,303
13,346
MMBtu
-
-
$
$56,650
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Administrative Changes Primary Raw Material By-product Production Electricity Usage Natural Gas Administrative Changes Primary Raw Material By-product Production