IAC Assessment: ND0326
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0326
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Foundry
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $100,000,000-$500,000,000
# of Employees 820
Plant Area (Sq.Ft.) 292,000
Annual Production 100,000 Tons
Production Hrs. Annual 8,424
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,783,408 60,569,755 kWh $0.03
Electricity Demand $677,171 37,400 kW-months/year $18.11
Natural Gas $736,807 239,377 MMBtu $3.08
TOTAL ENERGY COSTS $3,197,386
RECOMMENDED SAVINGS* $233,679 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $258
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$214,338
Cost:
$180,000
$(-1,779) (-60,375) $(-1,559) (-86) $217,676 67,392 - - - - - - $(-1,779)
(-60,375)
kWh
$(-1,559)
(-86)
kW-months/year
$217,676
67,392
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$126
Cost:
$160
$39 1,465 $33 2 - - - - $54 - - - $39
1,465
kWh
$33
2
kW-months/year
-
-
MMBtu
-
-
$
$54
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$11,257
Cost:
$2,000
$10,317 350,528 $940 52 - - - - - - - - $10,317
350,528
kWh
$940
52
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$60
Cost:
$87
$60 2,052 - - - - - - - - - - $60
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$198
Cost:
$40
$149 4,982 $130 7 - - - - $(-81) - - - $149
4,982
kWh
$130
7
kW-months/year
-
-
MMBtu
-
-
$
$(-81)
-
$
-
-
Tgal
06: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$6,520
Cost:
$14,100
- - $6,520 360 - - - - - - - - -
-
kWh
$6,520
360
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$568
Cost:
$1,800
$409 13,775 $239 13 - - $(-80) - - - - - $409
13,775
kWh
$239
13
kW-months/year
-
-
MMBtu
$(-80)
-
$
-
-
$
-
-
Tgal
08: 3.4151 MINIMIZE WATER USAGE Savings:
$912
Cost:
$1,760
- - - - - - - - - - $912 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$912
-
Tgal
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$(-300)
Cost:
$1,118
$132 4,396 $308 17 - - $(-740) - - - - - $132
4,396
kWh
$308
17
kW-months/year
-
-
MMBtu
$(-740)
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$233,679
Cost:
$201,065
$9,327 316,823 $6,611 365 $217,676 67,392 $(-820) - $(-27) - $912 - $9,327
316,823
kWh
$6,611
365
kW-months/year
$217,676
67,392
MMBtu
$(-820)
-
$
$(-27)
-
$
$912
-
Tgal
TOTAL IMPLEMENTED Savings:
$258
Cost:
$127
$209 7,034 $130 7 - - - - $(-81) - - - $209
7,034
kWh
$130
7
kW-months/year
-
-
MMBtu
-
-
$
$(-81)
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption