IAC logo
IAC Assessment: ND0340
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0340
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1999
Principal Product Coil Winding machines
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 31,000
Annual Production 50 Pieces
Production Hrs. Annual 2,295
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,357 532,239 kWh $0.05
Electricity Demand $9,889 2,317 kW-months/year $4.27
LPG $5,674 903 MMBtu $6.28
TOTAL ENERGY COSTS $41,920
RECOMMENDED SAVINGS* $10,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $349
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (haz) Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$9,628
Cost:
-
$1,777 36,049 $416 98 - - - - $7,435 - $1,777
36,049
kWh
$416
98
kW-months/year
-
-
lb
-
-
$
$7,435
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$329
Cost:
$240
$222 4,396 $107 25 - - - - - - $222
4,396
kWh
$107
25
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$297
Cost:
$40
$173 3,517 $79 18 - - $45 - - - $173
3,517
kWh
$79
18
kW-months/year
-
-
lb
$45
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$351
Cost:
$510
$158 3,224 $19 4 - - $174 - - - $158
3,224
kWh
$19
4
kW-months/year
-
-
lb
$174
-
$
-
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$134
Cost:
$500
- - - - $134 11 - - - - -
-
kWh
-
-
kW-months/year
$134
11
lb
-
-
$
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$20
Cost:
-
- - $20 5 - - - - - - -
-
kWh
$20
5
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$151
Cost:
$677
$102 2,052 $49 11 - - - - - - $102
2,052
kWh
$49
11
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$10,910
Cost:
$1,967
$2,432 49,238 $690 161 $134 11 $219 - $7,435 - $2,432
49,238
kWh
$690
161
kW-months/year
$134
11
lb
$219
-
$
$7,435
-
$
TOTAL IMPLEMENTED Savings:
$349
Cost:
$240
$222 4,396 $127 30 - - - - - - $222
4,396
kWh
$127
30
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (haz) Ancillary Material Cost One-time Revenue or Avoided Cost