IAC logo
IAC Assessment: NL0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2017
Principal Product Laboratory Analytical Instruments
NAICS 334516 - Analytical Laboratory Instrument Manufacturing
SIC 3826 - Analytical Instruments
Sales $50,000,000-$100,000,000
# of Employees 335
Plant Area (Sq.Ft.) 172,000
Annual Production 108,420 Units
Production Hrs. Annual 4,000
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,287 3,513,400 kWh $0.03
Electricity Demand $210,494 11,145 kW-months/year $18.89
Electricity Fees $14,892 - $ -
Natural Gas $62,336 7,260 MMBtu $8.59
TOTAL ENERGY COSTS $385,009
RECOMMENDED SAVINGS* $56,745 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,745
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,351
Cost:
$69,750
$8,686 313,600 $14,215 753 - - $2,450 - - - $8,686
313,600
kWh
$14,215
753
kW-months/year
-
-
gal
$2,450
-
$
-
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$14,999
Cost:
$22,000
$(-46) (-1,650) $(-680) (-36) $12,400 1,045 - - $3,325 - $(-46)
(-1,650)
kWh
$(-680)
(-36)
kW-months/year
$12,400
1,045
gal
-
-
$
$3,325
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,100
Cost:
-
$11,100 401,868 - - - - - - - - $11,100
401,868
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,082
Cost:
$4,000
$1,988 71,777 $2,094 111 - - - - - - $1,988
71,777
kWh
$2,094
111
kW-months/year
-
-
gal
-
-
$
-
-
$
05: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,213
Cost:
-
$1,213 44,000 - - - - - - - - $1,213
44,000
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,745
Cost:
$95,750
$22,941 829,595 $15,629 827 $12,400 1,045 $2,450 - $3,325 - $22,941
829,595
kWh
$15,629
827
kW-months/year
$12,400
1,045
gal
$2,450
-
$
$3,325
-
$
TOTAL IMPLEMENTED Savings:
$56,745
Cost:
$95,750
$22,941 829,595 $15,629 827 $12,400 1,045 $2,450 - $3,325 - $22,941
829,595
kWh
$15,629
827
kW-months/year
$12,400
1,045
gal
$2,450
-
$
$3,325
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes One-time Revenue or Avoided Cost