IAC logo
IAC Assessment: NL0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2017
Principal Product Grain and Field Beans
NAICS 424510 - Grain and Field Bean Merchant Wholesalers
SIC 5153 - Grain And Field Beans
Sales $10,000,000-$50,000,000
# of Employees 21
Plant Area (Sq.Ft.) 312,600
Annual Production 33,000,000 Bushels
Production Hrs. Annual 3,150
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,296 1,995,380 kWh $0.07
Electricity Demand $111,576 11,158 kW-months/year $10.00
Natural Gas $45,995 5,337 MMBtu $8.62
TOTAL ENERGY COSTS $292,367
RECOMMENDED SAVINGS* $50,275 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,323
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.5194 REDESIGN PROCESS Savings:
$37,689
Cost:
$38,000
$102 1,554 $2,487 249 $35,100 - $102
1,554
kWh
$2,487
249
kW-months/year
$35,100
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$10,263
Cost:
$10,000
$10,263 155,963 - - - - $10,263
155,963
kWh
-
-
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,632
Cost:
$4,788
$736 11,190 $896 90 - - $736
11,190
kWh
$896
90
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$691
Cost:
$3,360
$691 10,500 - - - - $691
10,500
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$50,275
Cost:
$56,148
$11,792 179,207 $3,383 338 $35,100 - $11,792
179,207
kWh
$3,383
338
kW-months/year
$35,100
-
$
TOTAL IMPLEMENTED Savings:
$2,323
Cost:
$8,148
$1,427 21,690 $896 90 - - $1,427
21,690
kWh
$896
90
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes