IAC logo
IAC Assessment: NL0011
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0011
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2017
Principal Product Corrugated and Solid Fiber Box Manufacturing
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 53
Plant Area (Sq.Ft.) 230,000
Annual Production 200,000 Thousand Feet
Production Hrs. Annual 2,250
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,077 1,211,904 kWh $0.05
Electricity Demand $69,863 7,000 kW-months/year $9.98
Electricity Fees $6,141 - $ -
Natural Gas $45,789 7,680 MMBtu $5.96
TOTAL ENERGY COSTS $177,870
RECOMMENDED SAVINGS* $13,738 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,729
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,874
Cost:
-
- - $6,874 689 - - -
-
kWh
$6,874
689
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,747
Cost:
$20,139
$2,282 49,350 $2,465 247 - - $2,282
49,350
kWh
$2,465
247
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,135
Cost:
$1,571
$1,579 34,118 - - $(-444) - $1,579
34,118
kWh
-
-
kW-months/year
$(-444)
-
$
04: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$982
Cost:
-
$982 21,356 - - - - $982
21,356
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$13,738
Cost:
$21,710
$4,843 104,824 $9,339 936 $(-444) - $4,843
104,824
kWh
$9,339
936
kW-months/year
$(-444)
-
$
TOTAL IMPLEMENTED Savings:
$5,729
Cost:
$20,139
$3,264 70,706 $2,465 247 - - $3,264
70,706
kWh
$2,465
247
kW-months/year
-
-
$